Entity Name: | MAHET'S CONSTRUCTION MANAGEMENT, LLC |
Jurisdiction: | FLORIDA |
Filing Type: |
Florida Limited Liability Co.
MAHET'S CONSTRUCTION MANAGEMENT, LLC is structured as a Limited Liability Company (LLC), a common business structure that offers its members limited liability protection, separating their personal assets from the company's debts and obligations. |
Status: |
Inactive
The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders. |
Date Filed: | 05 Nov 2014 (10 years ago) |
Date of dissolution: | 23 Sep 2016 (9 years ago) |
Last Event: | ADMIN DISSOLUTION FOR ANNUAL REPORT |
Event Date Filed: | 23 Sep 2016 (9 years ago) |
Document Number: | L14000172475 |
FEI/EIN Number |
47-2241166
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 1410 POLK CITY RD, HAINES CITY, FL, 33884, US |
Mail Address: | 1410 POLK CITY RD, HAINES CITY, FL, 33884, US |
ZIP code: | 33884 |
County: | Polk |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
ALDANA HERNANDEZ DANIEL | President | 1410 POLK CITY RD, HAINES CITY, FL, 33844 |
ROBERTO MARTIN FRANCISCA | Vice President | 1410 POLK CITY RD, HAINES CITY, FL, 33844 |
ALDANA HERNANDEZ DANIEL | Agent | 1410 POLK CITY RD, HAINES CITY, FL, 33844 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2016-09-23 | - | - |
CHANGE OF PRINCIPAL ADDRESS | 2015-01-26 | 1410 POLK CITY RD, HAINES CITY, FL 33884 | - |
CHANGE OF MAILING ADDRESS | 2015-01-26 | 1410 POLK CITY RD, HAINES CITY, FL 33884 | - |
REGISTERED AGENT ADDRESS CHANGED | 2015-01-26 | 1410 POLK CITY RD, HAINES CITY, FL 33844 | - |
Name | Date |
---|---|
ANNUAL REPORT | 2015-01-26 |
Florida Limited Liability | 2014-11-05 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
341389252 | 0418800 | 2016-04-08 | 8900 N. KENDALL DRIVE, MIAMI, FL, 33176 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1138064 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 VII |
Issuance Date | 2016-07-27 |
Current Penalty | 2450.0 |
Initial Penalty | 4900.0 |
Final Order | 2016-08-31 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: On or about April 8, 2016, at the above addressed jobsite, an employee working from a baker's scaffold applying cement on a vertical wall adjacent to an opening on the 4th floor garage was not protected from fall hazards due to the top rail being 31.5 inches. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19101200 E01 |
Issuance Date | 2016-07-27 |
Abatement Due Date | 2016-09-30 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2016-08-31 |
Nr Instances | 1 |
Nr Exposed | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met (Construction Reference: 1926.59): On or about April 8, 2016, at the above addressed jobsite, the employer did not develop and implement a hazard communication program for employees exposed to chemicals such as cement and silica being used when applying stucco. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION. |
Citation ID | 03001 |
Citaton Type | Other |
Standard Cited | 19030019 D01 |
Issuance Date | 2017-01-03 |
Abatement Due Date | 2017-02-21 |
Current Penalty | 400.0 |
Initial Penalty | 400.0 |
Final Order | 2017-01-31 |
Nr Instances | 1 |
Nr Exposed | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: On or about 8/22/2016, the employer did not send abatement documentation for citation 2 and item 1, contained in Inspection #1138925, which was issued on 7/27/2016. |
Date of last update: 02 Apr 2025
Sources: Florida Department of State