Entity Name: | LINDSAY PLUMBING, INC. |
Jurisdiction: | FLORIDA |
Filing Type: |
Domestic Profit
LINDSAY PLUMBING, INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act. |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 13 Oct 1992 (33 years ago) |
Document Number: | V71529 |
FEI/EIN Number |
593145254
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 662 JACKSON AVE, WINTER PARK, FL, 32789, US |
Mail Address: | 662 JACKSON AVE, WINTER PARK, FL, 32789, US |
ZIP code: | 32789 |
County: | Orange |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
LINDSAY, LEE NORRIS JR. | Agent | 662 Jackson Ave, Winter Park, FL, 32789 |
Lindsay Lee N | Director | 662 Jackson Ave, Winter Park, FL, 32789 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
REGISTERED AGENT ADDRESS CHANGED | 2021-02-03 | 662 Jackson Ave, Winter Park, FL 32789 | - |
CHANGE OF PRINCIPAL ADDRESS | 2000-01-22 | 662 JACKSON AVE, WINTER PARK, FL 32789 | - |
CHANGE OF MAILING ADDRESS | 2000-01-22 | 662 JACKSON AVE, WINTER PARK, FL 32789 | - |
Name | Date |
---|---|
ANNUAL REPORT | 2024-02-06 |
ANNUAL REPORT | 2023-01-30 |
ANNUAL REPORT | 2022-02-02 |
ANNUAL REPORT | 2021-02-03 |
ANNUAL REPORT | 2020-03-17 |
ANNUAL REPORT | 2019-04-08 |
ANNUAL REPORT | 2018-03-26 |
ANNUAL REPORT | 2017-03-22 |
ANNUAL REPORT | 2016-03-01 |
ANNUAL REPORT | 2015-03-22 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
346644800 | 0419730 | 2023-04-18 | 8550 MCCOY RD, ORLANDO, FL, 32801 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 2085801 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260651 C02 |
Issuance Date | 2023-09-28 |
Current Penalty | 4465.0 |
Initial Penalty | 4465.0 |
Final Order | 2023-10-25 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees a.) On or about April 18, 2023, at the jobsite, a suitable means of access/ egress was not provided to employees working in an unprotected trench that was up to 7 feet 10 inches deep, with near vertical walls, in class c soil. Employees entered and exited the excavation by climbing the trench excavation walls. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260651 J02 |
Issuance Date | 2023-09-28 |
Current Penalty | 4465.0 |
Initial Penalty | 4465.0 |
Final Order | 2023-10-25 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(j)(2):Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. a. On or about April 18, 2023, employees were exposed to crush-by and struck-by hazards, in that, employees were working in a trench that was up to 7 feet 10 inches deep, with near vertical walls, in class c soil and the spoil pile was set less than two feet away from the edge. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260652 A01 |
Issuance Date | 2023-09-28 |
Current Penalty | 4465.0 |
Initial Penalty | 4465.0 |
Final Order | 2023-10-25 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). a.) On or about April 18, 2023, at the jobsite, employees were exposed to crush-by hazards, in that, employees were working in a trench that was up to 7 feet 10 inches deep, with near vertical walls, in class c soil and without cave-in protection being provided. |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7508587105 | 2020-04-14 | 0491 | PPP | 662 JACKSON AVE, WINTER PARK, FL, 32789 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 03 Apr 2025
Sources: Florida Department of State