Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2019-07-17
|
Emphasis |
L: FALL, P: FALL
|
Case Closed |
2020-11-05
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
2313.0 |
Initial Penalty |
2313.0 |
Final Order |
2020-02-10 |
Nr Instances |
2 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) On or about July 17, 2019, at the southeast side of the commercial building, the second level of the supported scaffold used by employees to scratch stucco surface on front parapet wall was not fully planked, exposing employees to a 12 foot fall hazard. b) On or about July 17 2019, at the northeast side of the commercial building, the second level of the supported scaffold used by employees to apply plaster stucco on the wall was not fully planked, exposing the employees to a 10 foot fall hazard. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 C02 |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
2313.0 |
Initial Penalty |
2313.0 |
Final Order |
2020-02-10 |
Nr Instances |
2 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) On or about July 17, 2019, at the southeast side of the commercial building, the tubular framed scaffolding system 2 tiers high being used by employees plastering stucco was missing mudsills in all frames, exposing employees to fall, collapse and struck by hazards. b) On or about July 17, 2019, at the northeast side of the commercial building, the tubular framed scaffolding system 2 tiers high being used by employees plastering stucco was missing mudsills in all frames, exposing employees to fall, collapse and struck by hazards. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260451 E01 |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
2313.0 |
Initial Penalty |
2313.0 |
Final Order |
2020-02-10 |
Nr Instances |
2 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: a) On or about July 17, 2019, at the southeast northeast sides of the commercial building, employees used the tubular components of the scaffold to access the two levels of the frame scaffold. b) On or about July 17, 2019, at the northeast sides of the commercial building, employees used the tubular components of the scaffold to access the two levels of the frame scaffold. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19260451 G04 I |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
2313.0 |
Initial Penalty |
2313.0 |
Final Order |
2020-02-10 |
Nr Instances |
2 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. a) On or about July 17, 2019, at the southeast side of the commercial building, the north end of the second level of the supported scaffold used by employees to plaster stucco on the wall had no guardrail system installed, exposing the em employees to a 12 foot fall hazard. b) On or about July 17, 2019, at the northeast side of the commercial building, the north end of the second level of the supported scaffold used by employees to plaster stucco on the wall had no guardrail system installed, exposing the employees to a 10 foot fall hazard. |
|
Citation ID |
01005A |
Citaton Type |
Serious |
Standard Cited |
19260454 A |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
2313.0 |
Initial Penalty |
2313.0 |
Final Order |
2020-02-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a) On or about July 17, 2019 at the southeast and northeast sides of a commercial building, employees working on a supported scaffold while plastering stucco on the exterior wall had not been trained on the hazards of the scaffolding system. |
|
Citation ID |
01005B |
Citaton Type |
Serious |
Standard Cited |
19260454 B |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2020-02-10 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in: (a) On or about July 17, 2019, employees required to erect and dismantle masonry scaffold systems for work crews applying stucco cement to outside of a single story commercial building. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19101200 E01 |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2020-02-10 |
Nr Instances |
1 |
Nr Exposed |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) On July 17, 2019, at the east side of the commercial building; for employees handling hazardous materials such as but not limited to stucco cement. |
|
Citation ID |
02002 |
Citaton Type |
Other |
Standard Cited |
19260051 F03 III |
Issuance Date |
2020-01-16 |
Abatement Due Date |
2020-02-12 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2020-02-10 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.51(f)(3)(iii): Hand soap or similar cleansing agents was not provided: a) On or about July 17, 2019, for employees without hand protection, mixing, applying and scratching stucco cement. |
|
|