Search icon

HOLLOW METAL INC. - Florida Company Profile

Company Details

Entity Name: HOLLOW METAL INC.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

HOLLOW METAL INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 28 Aug 1995 (30 years ago)
Date of dissolution: 30 Jan 2017 (8 years ago)
Last Event: VOLUNTARY DISSOLUTION
Event Date Filed: 30 Jan 2017 (8 years ago)
Document Number: P95000067302
FEI/EIN Number 593335892

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 5275 CAUSEWAY BLVD. #4, TAMPA, FL, 33619, US
Mail Address: 5275 CAUSEWAY BLVD. #4, TAMPA, FL, 33619, US
ZIP code: 33619
County: Hillsborough
Place of Formation: FLORIDA

form 5500

Plan Name Plan Year EIN/PN Received Sponsor Total number of participants
HOLLOW METAL, INC. PROFIT SHARING PLAN 2010 593335892 2011-05-14 HOLLOW METAL, INC. 15
Three-digit plan number (PN) 001
Effective date of plan 2002-01-01
Business code 812990
Sponsor’s telephone number 8132464112
Plan sponsor’s address 5275 CAUSEWAY BOULEVARD, TAMPA, FL, 33619

Plan administrator’s name and address

Administrator’s EIN 593335892
Plan administrator’s name HOLLOW METAL, INC.
Plan administrator’s address 5275 CAUSEWAY BOULEVARD, TAMPA, FL, 33619
Administrator’s telephone number 8132464112

Signature of

Role Plan administrator
Date 2011-05-14
Name of individual signing NORRIS GORDON
Valid signature Filed with incorrect/unrecognized electronic signature
HOLLOW METAL, INC. PROFIT SHARING PLAN 2010 593335892 2011-05-14 HOLLOW METAL, INC. 15
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2002-01-01
Business code 812990
Sponsor’s telephone number 8132464112
Plan sponsor’s address 5275 CAUSEWAY BOULEVARD, TAMPA, FL, 33619

Plan administrator’s name and address

Administrator’s EIN 593335892
Plan administrator’s name HOLLOW METAL, INC.
Plan administrator’s address 5275 CAUSEWAY BOULEVARD, TAMPA, FL, 33619
Administrator’s telephone number 8132464112

Signature of

Role Plan administrator
Date 2011-05-14
Name of individual signing NICHOLETTE THORNTON
Valid signature Filed with authorized/valid electronic signature
HOLLOW METAL, INC. PROFIT SHARING PLAN 2009 593335892 2010-07-19 HOLLOW METAL, INC. 15
File View Page
Three-digit plan number (PN) 001
Effective date of plan 2002-01-01
Business code 812990
Sponsor’s telephone number 8132464112
Plan sponsor’s address 5275 CAUSEWAY BOULEVARD, TAMPA, FL, 33619

Plan administrator’s name and address

Administrator’s EIN 593335892
Plan administrator’s name HOLLOW METAL, INC.
Plan administrator’s address 5275 CAUSEWAY BOULEVARD, TAMPA, FL, 33619
Administrator’s telephone number 8132464112

Signature of

Role Plan administrator
Date 2010-07-19
Name of individual signing NICHOLETTE THORNTON
Valid signature Filed with authorized/valid electronic signature

Key Officers & Management

Name Role Address
GORDON NORRIS President 2803 PARK MEADOW DR., VALRICO, FL, 33594
GORDON NORRIS Treasurer 2803 PARK MEADOW DR., VALRICO, FL, 33594
GORDON DOREEN Secretary 2803 PARK MEADOW DR, VALRICO, FL, 33594
GORDON NORRIS Agent 2803 PARK MEADOW DR., VALRICO, FL, 33594

Events

Event Type Filed Date Value Description
VOLUNTARY DISSOLUTION 2017-01-30 - -
CHANGE OF PRINCIPAL ADDRESS 2006-01-05 5275 CAUSEWAY BLVD. #4, TAMPA, FL 33619 -
CHANGE OF MAILING ADDRESS 2006-01-05 5275 CAUSEWAY BLVD. #4, TAMPA, FL 33619 -
REGISTERED AGENT ADDRESS CHANGED 2006-01-05 2803 PARK MEADOW DR., VALRICO, FL 33594 -

Documents

Name Date
Voluntary Dissolution 2017-01-30
ANNUAL REPORT 2016-03-23
ANNUAL REPORT 2015-02-23
ANNUAL REPORT 2014-01-13
ANNUAL REPORT 2013-01-25
ANNUAL REPORT 2012-01-05
ANNUAL REPORT 2011-02-17
ANNUAL REPORT 2010-01-08
ANNUAL REPORT 2009-01-27
ANNUAL REPORT 2008-01-08

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339585119 0420600 2014-02-13 5275 CAUSEWAY BLVD, TAMPA, FL, 33619
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2014-03-28
Emphasis N: AMPUTATE
Case Closed 2015-03-10

Related Activity

Type Referral
Activity Nr 871533
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100147 C01
Issuance Date 2014-03-31
Abatement Due Date 2014-05-15
Current Penalty 675.0
Initial Penalty 1600.0
Final Order 2014-04-14
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative: a) Throughout Plant The employer did not establish and implement a written energy control program, on or about, 02/13/14.
Citation ID 01002
Citaton Type Serious
Standard Cited 19100212 A01
Issuance Date 2014-03-31
Abatement Due Date 2014-06-16
Current Penalty 825.0
Initial Penalty 2000.0
Final Order 2014-04-14
Nr Instances 3
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by an inadequately guarded power press and unguarded unsed portion of a press brake. a) Door Department - Zeh & Hannemann 30 Ton Full Revolution Power Press - The existing fixed barrier guard did not enclose the top and side openings allowing for entry into the point of operation, on or about, 02/13/14. b) Spot Welding Area - Niagara 30 Ton Full Revolution Power Press - The existing fixed barrier guard did not enclose the top and side openings allowing for entry into the point of operation, on or about, 02/13/14. c) Press Brake Department - Cincinnati Press Brakes 250 Tons (2) Unguarded used portions of press dies, on or about, 02/13/14.
Citation ID 01003
Citaton Type Serious
Standard Cited 19100212 A03 II
Issuance Date 2014-03-31
Abatement Due Date 2014-06-16
Current Penalty 825.0
Initial Penalty 2000.0
Final Order 2014-04-14
Nr Instances 6
Nr Exposed 6
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) Metal Stud Area - Verson All Steel Press Brake - 45 Ton - Serial # 11536-2062-A Unguarded point of operation, on or about, 02/13/14. b) Press Brake Department - Cincinnati Press Brakes (2) 250 Tons - Unguarded point of operations, on or about, 02/13/14. c) Door Department - Lors Machinery Inc. Spot Welder - Model # 140 AR-OV - Serial # 100-6811 - Unguarded point of operation, on or about, 02/13/14. d) Spotwelding Area - Lors Spot Welder - Serial # 1955864 - Model # 418 Unguarded point of operation, on or about, 02/13/14. e) Shear Area - Accurshear Shear - Model# 613510 - Serial # 3401 - Inadequately guarded point of operation and an unguarded point of operation behind the shear, on or about, 02/13/14.
Citation ID 01004
Citaton Type Serious
Standard Cited 19100219 B01
Issuance Date 2014-03-31
Abatement Due Date 2014-05-15
Current Penalty 675.0
Initial Penalty 1600.0
Final Order 2014-04-14
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv)(a) a) Door Department - Zeh & Hannemann Co. 20 Ton Full Revolution Power Press Inadequately guarded flywheel on inside face of machine, on or about, 02/13/14.
Citation ID 02001
Citaton Type Other
Standard Cited 19100217 B04 II
Issuance Date 2014-03-31
Abatement Due Date 2014-05-15
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-04-14
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.217(b)(4)(ii): Mechanical power press(es) using full revolution clutches were not provided with a pad with a nonslip contact area firmly attached to the pedal: a) Spotwelding Area - Niagara Full Revolution Power Press - 30 Tons The foot pedal was missing a non-slip pad, on or about, 02/13/14.
Citation ID 02002
Citaton Type Other
Standard Cited 19100217 B04 III
Issuance Date 2014-03-31
Abatement Due Date 2014-05-15
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-04-14
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.217(b)(4)(iii): Pedal return spring(s) of pedal(s) used on mechanical power press(es) using full revolution clutches were not of the compression type, operating on a rod or guided within a hole or tube, or designed to prevent interleaving of sspring coils in the event of breakage: a) Spotwelding Area - Niagara Full Revolution Power Press - 30 Tons - The pedal spring was not operating on a rod or guided within a hole or tube and was attached to the press's single stroke mechanism via a string, on or about, 02/13/14.
Citation ID 02003
Citaton Type Other
Standard Cited 19100303 B01
Issuance Date 2014-03-31
Abatement Due Date 2014-04-14
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-04-14
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) Door Department - Zeh & Hannemann Co. 20 Ton Full Revolution Power Press The power powering the press's foot pedal was torn from the grommet allowing for exposed live insulated conductors, on or about, 02/13/14.
339575805 0420600 2014-02-06 5275 CAUSEWAY BLVD, TAMPA, FL, 33619
Inspection Type Planned
Scope Partial
Safety/Health Health
Close Conference 2014-02-06
Emphasis L: FORKLIFT, N: AMPUTATE, N: ISOCYAN8, P: ISOCYAN8
Case Closed 2014-07-10

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19100038 B
Issuance Date 2014-04-21
Abatement Due Date 2014-05-15
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-05-15
Nr Instances 1
Nr Exposed 11
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.38(b): An emergency action plan was not in writing, kept in the workplace, and available to employees for review: (a) At the site, employees were exposed to hazards, such as but not limited to, smoke inhalation, trips, slips or falls, in that, the employer did not have a written emergency action plan.
Citation ID 01002
Citaton Type Other
Standard Cited 19100134 A02
Issuance Date 2014-04-21
Abatement Due Date 2014-05-08
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-05-15
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.134(a)(2): The employer did not establish and maintain a respiratory protection program which included the requirements outlined in 29 CFR 1910.134(c): (a)At the site, where chemical products such as DegaBond 55 adhesive were used and employees were required to wear respirators, there was no respirator program exposing employees to an inhalation hazard.
Citation ID 01003
Citaton Type Other
Standard Cited 19101200 E01
Issuance Date 2014-04-21
Abatement Due Date 2014-05-08
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-05-15
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (a)At the site, where chemicals products such as DegaBond 55 adhesive were used, there was no hazard communication program exposing employees to an inhalation hazard.

Date of last update: 01 Apr 2025

Sources: Florida Department of State