Entity Name: | LION POWER BUILDERS INC |
Jurisdiction: | FLORIDA |
Filing Type: |
Domestic Profit
LION POWER BUILDERS INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act. |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 20 Oct 2020 (5 years ago) |
Last Event: | REINSTATEMENT |
Event Date Filed: | 07 Nov 2021 (3 years ago) |
Document Number: | P20000084172 |
FEI/EIN Number |
85-3689165
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 3111 W Braddock St, Tampa, FL, 33607, US |
Mail Address: | 3111 W Braddock St, Tampa, FL, 33607, US |
ZIP code: | 33607 |
County: | Hillsborough |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
SERRANO OMAR A | President | 7508 COPPER LN, PORT RICHEY, FL, 34668 |
SERRANO OMAR A | Agent | 7508 COPPER LN, PORT RICHEY, FL, 34668 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
REINSTATEMENT | 2021-11-07 | - | - |
REGISTERED AGENT NAME CHANGED | 2021-11-07 | SERRANO, OMAR A | - |
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2021-09-24 | - | - |
CHANGE OF PRINCIPAL ADDRESS | 2020-11-05 | 3111 W Braddock St, Tampa, FL 33607 | - |
CHANGE OF MAILING ADDRESS | 2020-11-05 | 3111 W Braddock St, Tampa, FL 33607 | - |
Name | Date |
---|---|
ANNUAL REPORT | 2025-02-12 |
ANNUAL REPORT | 2024-07-12 |
ANNUAL REPORT | 2023-02-08 |
ANNUAL REPORT | 2022-03-10 |
REINSTATEMENT | 2021-11-07 |
Domestic Profit | 2020-10-20 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345613830 | 0420600 | 2021-11-02 | 2103 BAYSHORE BLVD, TAMPA, FL, 33606 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1828840 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1564014 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260451 F03 |
Issuance Date | 2022-04-01 |
Current Penalty | 3190.55 |
Initial Penalty | 5801.0 |
Final Order | 2022-04-29 |
Nr Instances | 1 |
Nr Exposed | 20 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(f)(3):Scaffold and scaffold components were not inspected for visible defects by a competent person before each workshift and after any occurrence which could affect a scaffold's structural integrity: a) At the Hyde Park Project - 2103 Bayshore Blvd, Tampa, FL: On or about November 1, 2021, employees were exposed to struck-by injures and possible scaffold collapse from not inspecting scaffold components before distributing them for assembly and assembling them. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260451 F07 |
Issuance Date | 2022-04-01 |
Abatement Due Date | 2022-05-27 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2022-04-29 |
Nr Instances | 1 |
Nr Exposed | 20 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a) At the Hyde Park Project - 2103 Bayshore Blvd, Tampa, FL: On or about November 1, 2021, employees were exposed to struck-by injures and possible scaffold collapse from not having trained employees assembling the scaffold. |
Date of last update: 01 May 2025
Sources: Florida Department of State