Search icon

STUCCO & RENOVATIONS, INC - Florida Company Profile

Company Details

Entity Name: STUCCO & RENOVATIONS, INC
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

STUCCO & RENOVATIONS, INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 17 Jun 2019 (6 years ago)
Date of dissolution: 23 Sep 2022 (3 years ago)
Last Event: ADMIN DISSOLUTION FOR ANNUAL REPORT
Event Date Filed: 23 Sep 2022 (3 years ago)
Document Number: P19000051339
FEI/EIN Number 842288792

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 5785 DANUBE WAY, ORLANDO, FL, 32807, US
Mail Address: 5785 DANUBE WAY, ORLANDO, FL, 32807, US
ZIP code: 32807
County: Orange
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
RAMOS RAMOS SANTA J President 5785 DANUBE WAY, ORLANDO, FL, 32807
RAMOS RAMOS SANTA J Agent 5785 DANUBE WAY, ORLANDO, FL, 32807

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2022-09-23 - -
CHANGE OF PRINCIPAL ADDRESS 2021-04-18 5785 DANUBE WAY, ORLANDO, FL 32807 -
CHANGE OF MAILING ADDRESS 2021-04-18 5785 DANUBE WAY, ORLANDO, FL 32807 -
REGISTERED AGENT ADDRESS CHANGED 2021-04-18 5785 DANUBE WAY, ORLANDO, FL 32807 -
AMENDMENT 2019-09-13 - -

Documents

Name Date
ANNUAL REPORT 2021-04-18
ANNUAL REPORT 2020-05-07
Amendment 2019-09-13
Domestic Profit 2019-06-17

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
345447700 0420600 2021-07-19 LAKELAND BLVD AND VILLAGE LAKES BLVD., LAKELAND, FL, 33805
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2021-07-19
Emphasis L: FALL
Case Closed 2022-11-03

Related Activity

Type Complaint
Activity Nr 1787769
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260453 B02 V
Issuance Date 2021-10-05
Abatement Due Date 2021-11-01
Current Penalty 4096.0
Initial Penalty 4096.0
Final Order 2021-11-19
Nr Instances 1
Nr Exposed 1
Related Event Code (REC) Complaint
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift: Note: As of January 1, 1998, subpart M of this part (1926.502(d) provides that body belts are not acceptable as part of a personal fall arrest system. The use of a body belt in a tethering system or in a restraint system is acceptable and is regulated. a. On or about July 19, 2021, an employee was operating an aerial lift to install siding on the exterior walls of a three story apartment building, during which time a restraint type body belt or a Personal Fall Arrest System was not worn by the operator and/ or the lanyard was not attached to the boom or basket; therefore exposing the employees to a fall hazard.
Citation ID 01002A
Citaton Type Serious
Standard Cited 19260502 D16 III
Issuance Date 2021-10-05
Abatement Due Date 2021-11-01
Current Penalty 4096.0
Initial Penalty 4096.0
Final Order 2021-11-19
Nr Instances 1
Nr Exposed 1
Related Event Code (REC) Complaint
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.502(d)(16)(iii): Personal fall arrest systems, when stopping a fall, were not rigged such that an employee could not free fall more than 6 feet (1.8 m) nor contact any lower level: a. On or about July 18, 2021, an employee was operating an aerial lift to install siding on the exterior walls of a three story apartment building while wearing a Personal Fall Arrest System (PFAS), wherein the system(s) were rigged such that during a fall, the employee would have free fallen more than 6 feet and/ or the system(s) were rigged such that the employee would have contacted the lower level; therefore exposing the employees to a fall hazard.
Citation ID 01002B
Citaton Type Serious
Standard Cited 19260503 A02 III
Issuance Date 2021-10-05
Abatement Due Date 2021-11-01
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2021-11-19
Nr Instances 1
Nr Exposed 1
Related Event Code (REC) Complaint
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.503(a)(2)(iii): The employer did not assure that each employee has been trained, as necessary, by a competent person in the use and operation of guardrail systems, safety net systems, warning line systems, safety monitoring systems, controlled access zones, and other protection to be used. a. On or about July 18, 2021, an employee was operating an aerial lift to install siding on the exterior walls of a three story apartment building while wearing a Personal Fall Arrest System (PFAS), wherein the employer did not ensure that each employee had been trained, by a Competent person qualified in the use and operation of personal fall arrest systems, in subject areas such as PFAS limitations/ minimum fall height, and the nature of fall hazards in the work area, nor did the employer ensure that a Competent and Qualified person evaluated the fall protection knowledge and skills of trainees through written testing and performance assessments; therefore exposing the employees to a fall hazard.

Date of last update: 03 Apr 2025

Sources: Florida Department of State