Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2019-01-17
|
Emphasis |
L: FALL
|
Case Closed |
2023-04-13
|
Related Activity
Type |
Complaint |
Activity Nr |
1417615 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260501 B13 |
Issuance Date |
2019-02-07 |
Abatement Due Date |
2019-03-06 |
Current Penalty |
2842.0 |
Initial Penalty |
2842.0 |
Final Order |
2019-03-06 |
Nr Instances |
1 |
Nr Exposed |
1 |
Related Event Code (REC) |
Complaint |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): On or about January 17, 2019, at 6300 Griffin Road, Building B, Davie, Florida, an employee was conducting roofing work on a 4:12 pitch roof without fall protection, exposing the employee to a fall hazard of 50 feet. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260502 D15 |
Issuance Date |
2019-02-07 |
Abatement Due Date |
2019-03-06 |
Current Penalty |
3978.0 |
Initial Penalty |
3978.0 |
Final Order |
2019-03-06 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.502(d)(15): Anchorage used for attachment for personal fall arrest equipment was not capable of supporting at least 5,000 pounds (22.2 kN) per employee attached nor was it designed, installed and used as part of a complete personal fall arrest system which maintains a safety factor of at least two; and under the supervision of a qualified person: On or about January 17, 2019, at Bldg. B on 6300 Griffin Road, Davie, Florida, 3 employees were conducting roofing work on a 4:12 pitch roof and where tied off to one single anchor, exposing the employees to a fall hazard of 50 feet. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260503 A01 |
Issuance Date |
2019-02-07 |
Abatement Due Date |
2019-03-06 |
Current Penalty |
3978.0 |
Initial Penalty |
3978.0 |
Final Order |
2019-03-06 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: On or about January 17, 2019, at Bldg. B on 6300 Griffin Road, Davie, Florida, 3 employees were conducting roofing work on a 4:12 pitch roof without any training on fall protection, exposing the employees to a fall hazard of 50 feet. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19030019 C01 |
Issuance Date |
2019-04-19 |
Abatement Due Date |
2019-05-24 |
Current Penalty |
319.0 |
Initial Penalty |
319.0 |
Final Order |
2019-05-20 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: a) On or about April 19, 2019, the employer failed to submit certification of corrective action for Citation 1, item 1, issued on 02/07/2019 with an abatement due date of 03/06/2019. |
|
Citation ID |
02002 |
Citaton Type |
Other |
Standard Cited |
19030019 D01 |
Issuance Date |
2019-04-19 |
Abatement Due Date |
2019-05-24 |
Current Penalty |
319.0 |
Initial Penalty |
319.0 |
Final Order |
2019-05-20 |
Nr Instances |
2 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: a) On or about April 19, 2019, the employer failed to submit certification of corrective action for Citation 1, item 2, issued on 02/07/2019 with an abatement due date of 03/06/2019. b) On or about April 19, 2019, the employer failed to submit certification of corrective action for Citation 1, item 3, issued on 02/07/2019 with an abatement due date of 03/06/2019. |
|
|