Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2019-06-07
|
Emphasis |
L: FALL, P: FALL
|
Case Closed |
2021-01-25
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260501 B13 |
Issuance Date |
2019-06-13 |
Abatement Due Date |
2019-09-30 |
Current Penalty |
2273.4 |
Initial Penalty |
3789.0 |
Final Order |
2019-09-25 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): On or about May 7, 2019, at a job site located at 596 SW Jeanne Ave., Port Saint Lucie, Florida, 34953, 4 employees were exposed to a 9-foot fall hazard to ground level, while installing plywood on the trusses of a new residential roof and not using any methods of conventional fall protection. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19030019 D01 |
Issuance Date |
2019-11-14 |
Abatement Due Date |
2019-12-19 |
Current Penalty |
425.0 |
Initial Penalty |
425.0 |
Final Order |
2019-12-11 |
Nr Instances |
3 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: a) On or about November 14, 2019, the employer failed to submit documentation and certification of corrective action for Citation 1, item 1, issued on 06/13/2019 with an abatement due date of 09/30/2019. |
|
|