Entity Name: | GILMORE REMODELING INC |
Jurisdiction: | FLORIDA |
Filing Type: |
Domestic Profit
GILMORE REMODELING INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act. |
Status: |
Inactive
The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders. |
Date Filed: | 15 Jun 2017 (8 years ago) |
Date of dissolution: | 28 Sep 2018 (7 years ago) |
Last Event: | ADMIN DISSOLUTION FOR ANNUAL REPORT |
Event Date Filed: | 28 Sep 2018 (7 years ago) |
Document Number: | P17000052832 |
FEI/EIN Number |
821876662
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 41013 POSEY DR, EUSTIS, FL, 32736, US |
Mail Address: | 41013 POSEY DR, EUSTIS, FL, 32736, US |
ZIP code: | 32736 |
County: | Lake |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
GILMORE JESS | President | 41013 POSEY DR, EUSTIS, FL, 32736 |
GILMORE BARRY | Vice President | 41013 POSEY DR, EUSTIS, FL, 32736 |
GILMORE COREY | Director | 41013 POSEY DR, EUSTIS, FL, 32736 |
GILMORE BARRY | Agent | 41013 POSEY DR, EUSTIS, FL, 32736 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2018-09-28 | - | - |
Name | Date |
---|---|
Domestic Profit | 2017-06-15 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342432044 | 0420600 | 2017-06-27 | 3727 MILLENIA BLVD., ORLANDO, FL, 32839 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2017-10-06 |
Current Penalty | 3803.0 |
Initial Penalty | 3803.0 |
Final Order | 2017-12-22 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) On or about 06/27/2017 at the front of building # 3727 Millenia Blvd, Orlando, FL, the second & third level of the scaffold system was not fully planked. Employees were installing wood panels on the building walls exposed to a 18.9 ft. fall hazard. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 G04 I |
Issuance Date | 2017-10-06 |
Current Penalty | 3803.0 |
Initial Penalty | 3803.0 |
Final Order | 2017-12-22 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. a) On or about 06/27/2017 at the front of building # 3727 Millenia Blvd, Orlando, FL, guardrails system was missing on all levels on the scaffold. Employees were installing wood panels on the building walls exposed to a 18.9 ft. fall hazard. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 H02 II |
Issuance Date | 2017-10-06 |
Current Penalty | 1630.0 |
Initial Penalty | 1630.0 |
Final Order | 2017-12-22 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below:Note: This requirement does not apply to float (ship) scaffolds where an edging of 3/4 inch x 1 1/2 inch (2 x 4 cm) wood or equivalent was used in lieu of toeboards. a) On or about 06/27/20117 at the front of building # 3727, toeboards were missing on the scaffold. Employees on the lower level were exposed to a struck-by hazard. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260454 A03 |
Issuance Date | 2017-10-06 |
Abatement Due Date | 2017-10-26 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2017-12-22 |
Nr Instances | 1 |
Nr Exposed | 3 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold(s) trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold(s) being used and to understand the procedures to control or minimize those hazards. a) On or about 06/27/2017, training records were not provided to verify employees had received training to recognize the fall hazards from the scaffold and procedures to follow or minimize fall hazards. |
Date of last update: 01 Apr 2025
Sources: Florida Department of State