Search icon

SCI MATERIALS, INC. - Florida Company Profile

Company Details

Entity Name: SCI MATERIALS, INC.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

SCI MATERIALS, INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 23 Sep 2016 (9 years ago)
Date of dissolution: 30 Nov 2016 (8 years ago)
Last Event: CONVERSION
Event Date Filed: 30 Nov 2016 (8 years ago)
Document Number: P16000078219
FEI/EIN Number 813915567

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 15251 N. HWY. 329, REDDICK, FL, 32666, US
Mail Address: 15251 N. HWY. 329, REDDICK, FL, 32666, US
ZIP code: 32666
County: Putnam
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
COUNTS STEVEN C Director 15251 N. HWY. 329, REDDICK, FL, 32666
DEAN MICHAEL EP.A. Agent 230 NE 25TH AVENUE, SUITE 300, OCALA, FL, 34470

Events

Event Type Filed Date Value Description
CONVERSION 2016-11-30 - CONVERSION MEMBER. RESULTING CORPORATION WAS L16000216669. CONVERSION NUMBER 300000166123
CONVERSION 2016-09-23 - CORPORATION WAS A CONVERSION RESULT. CONVERTING CORPORATION WAS L16000169956. CONVERSION NUMBER 700000164567

Documents

Name Date
Domestic Profit 2016-09-23

Mines

Mine Name Type Status Primary Sic
Ocala Quarry Surface Active Leonardite
Directions to Mine From Bartow go to I-75 north to Ocala, exit U.S. 441 north and go north to C.R. 329, west on C.R.329, mine located 1/4 mile past intersection C.R 329 and C.R. 316, mine on north side.

Parties

Name MFM Limestone LLC
Role Operator
Start Date 2009-01-05
End Date 2016-04-25
Name Magnum Materials LLC
Role Operator
Start Date 2016-04-26
End Date 2016-10-26
Name SCI Materials, Inc.
Role Operator
Start Date 2016-10-27
End Date 2022-10-16
Name Georgia Stone Products LLC
Role Operator
Start Date 2022-10-17
Name Summit Materials LLC
Role Current Controller
Start Date 2022-10-17
Name Georgia Stone Products LLC
Role Current Operator

Accidents

Accident Date 2022-11-01
Degree Inhury DAYS RESTRICTED ACTIVITY ONLY
Accident Type Fall to the walkway or working surface
Ocupation Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
Narrative EE was working at the plant on a clog in a discharge pipe. An other EE open the grating to clear out the discharge line. Grating to manhole was not replaced correctly and the other EE step on grating which cause EE to fall and fracture left wrist.
Accident Date 2018-02-26
Degree Inhury DYS AWY FRM WRK & RESTRCTD ACT
Accident Type Over-exertion in pulling or pushing objects
Ocupation Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
Narrative The miner was replacing the turn table on SCI's VSI crusher. When pushing the heavy table into place, EE sprained EE's knee.
Accident Date 2017-08-16
Degree Inhury ACCIDENT ONLY
Accident Type Accident type, without injuries
Ocupation NO VALUE FOUND
Narrative SCI Materials's mechanic was preparing to jack up a stacking conveyor using a handheld 20 ton bottle jack. A vehicle was parked underneath the stacker. As the conveyor was jacked up it slowly tilted forward. The support beam of the stacker gently rested onto the hood of the vehicle, causing minimal damage to the hood and windshield. No injuries occurred.
Accident Date 2017-06-05
Degree Inhury DAYS RESTRICTED ACTIVITY ONLY
Accident Type Struck against a moving object
Ocupation Rotary bucket excavator operator
Narrative At 10 am on Monday, June 5th a Cat 773B 50 ton haul truck was backed up to a Linkbelt 350 excavator. While being loaded, an air valve gave way on the truck. This caused the brakes to go out, and the driver backed into the Excavator. The haul truck and driver suffered no damage/injury. The excavator and operator suffered minor damage/minor injury.

Inspections

Start Date 2024-11-21
End Date 2024-11-21
Activity Verbal Hazard Complaint Inspections
Number Inspectors 1
Total Hours 6.25
Start Date 2024-07-23
End Date 2024-07-30
Activity Verbal Hazard Complaint Inspections
Number Inspectors 1
Total Hours 6.5
Start Date 2024-04-16
End Date 2024-04-17
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 10
Start Date 2023-10-30
End Date 2023-11-01
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 16.75
Start Date 2023-05-23
End Date 2023-05-25
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 28.75
Start Date 2022-11-07
End Date 2022-11-08
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 19
Start Date 2022-04-05
End Date 2022-04-07
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 32.75
Start Date 2022-03-16
End Date 2022-03-17
Activity 103 (g) Written Notification Hazard Complaint Inspectio
Number Inspectors 2
Total Hours 26.5
Start Date 2022-03-16
End Date 2022-03-17
Activity Spot Inspection
Number Inspectors 1
Total Hours 1.75
Start Date 2022-03-03
End Date 2022-03-04
Activity Verbal Hazard Complaint Inspections
Number Inspectors 1
Total Hours 17.25
Start Date 2021-11-15
End Date 2021-11-19
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 9
Start Date 2021-05-20
End Date 2021-05-21
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 10.75
Start Date 2021-02-25
End Date 2021-02-25
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 6.75
Start Date 2020-07-14
End Date 2020-07-21
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 16.25
Start Date 2020-03-05
End Date 2020-03-06
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 17.25
Start Date 2020-03-05
End Date 2020-03-06
Activity Special Emphasis Programs
Number Inspectors 1
Total Hours 1.25
Start Date 2020-01-17
End Date 2020-01-17
Activity Spot Inspection
Number Inspectors 1
Total Hours 1
Start Date 2020-01-16
End Date 2020-01-17
Activity 103 (g) Written Notification Hazard Complaint Inspectio
Number Inspectors 1
Total Hours 10.25
Start Date 2019-07-09
End Date 2019-07-12
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 26
Start Date 2019-05-17
End Date 2019-05-17
Activity Other Technical Compliance Investigations
Number Inspectors 1
Total Hours 1

Productions

Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2024
Annual Hours 17451
Annual Coal Prod 0
Avg. Annual Empl. 8
Avg. Employee Hours 2181
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2024
Annual Hours 25378
Annual Coal Prod 0
Avg. Annual Empl. 10
Avg. Employee Hours 2538
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2024
Annual Hours 8045
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 2011
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2023
Annual Hours 20560
Annual Coal Prod 0
Avg. Annual Empl. 8
Avg. Employee Hours 2570
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2023
Annual Hours 27066
Annual Coal Prod 0
Avg. Annual Empl. 9
Avg. Employee Hours 3007
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2023
Annual Hours 7947
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 1987
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2022
Annual Hours 50796
Annual Coal Prod 0
Avg. Annual Empl. 18
Avg. Employee Hours 2822
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2022
Annual Hours 15781
Annual Coal Prod 0
Avg. Annual Empl. 7
Avg. Employee Hours 2254
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2022
Annual Hours 4150
Annual Coal Prod 0
Avg. Annual Empl. 3
Avg. Employee Hours 1383
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2021
Annual Hours 62361
Annual Coal Prod 0
Avg. Annual Empl. 26
Avg. Employee Hours 2399
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2021
Annual Hours 10557
Annual Coal Prod 0
Avg. Annual Empl. 5
Avg. Employee Hours 2111
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2021
Annual Hours 5982
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 2991
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2020
Annual Hours 56455
Annual Coal Prod 0
Avg. Annual Empl. 25
Avg. Employee Hours 2258
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2020
Annual Hours 11055
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 2764
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2020
Annual Hours 3760
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 1880
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2019
Annual Hours 50625
Annual Coal Prod 0
Avg. Annual Empl. 24
Avg. Employee Hours 2109
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2019
Annual Hours 9697
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 2424
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2019
Annual Hours 3313
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 1657
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2018
Annual Hours 47001
Annual Coal Prod 0
Avg. Annual Empl. 20
Avg. Employee Hours 2350
Sub-Unit Desc MILL OPERATION/PREPARATION PLANT
Year 2018
Annual Hours 9105
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 2276

Date of last update: 03 Apr 2025

Sources: Florida Department of State