Entity Name: | ECM CONSTRUCTION INC. |
Jurisdiction: | FLORIDA |
Filing Type: |
Domestic Profit
ECM CONSTRUCTION INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act. |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 24 Feb 2016 (9 years ago) |
Document Number: | P16000017877 |
FEI/EIN Number |
811617184
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 644 INDIANA ST, ORLANDO, FL, 32805, US |
Mail Address: | 644 INDIANA ST, ORLANDO, FL, 32805, US |
ZIP code: | 32805 |
County: | Orange |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
CARDENAS EDDY J | President | 644 INDIANA ST, ORLANDO, FL, 32805 |
CARDENAS EDDY J | Agent | 644 INDIANA ST, ORLANDO, FL, 32805 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
CHANGE OF PRINCIPAL ADDRESS | 2019-03-28 | 644 INDIANA ST, ORLANDO, FL 32805 | - |
CHANGE OF MAILING ADDRESS | 2019-03-28 | 644 INDIANA ST, ORLANDO, FL 32805 | - |
REGISTERED AGENT ADDRESS CHANGED | 2019-03-28 | 644 INDIANA ST, ORLANDO, FL 32805 | - |
Name | Date |
---|---|
ANNUAL REPORT | 2024-04-23 |
ANNUAL REPORT | 2023-03-03 |
ANNUAL REPORT | 2022-03-15 |
ANNUAL REPORT | 2021-04-09 |
ANNUAL REPORT | 2020-03-20 |
ANNUAL REPORT | 2019-03-28 |
ANNUAL REPORT | 2018-01-15 |
ANNUAL REPORT | 2017-02-11 |
Domestic Profit | 2016-02-24 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
347639809 | 0419730 | 2024-07-23 | 8927 FUTURES DRIVE, ORLANDO, FL, 32819 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1763959 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260501 B01 |
Issuance Date | 2024-08-02 |
Abatement Due Date | 2024-08-28 |
Current Penalty | 2074.2 |
Initial Penalty | 3457.0 |
Final Order | 2024-09-17 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Imminent Danger |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(1):Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. a) On or about July 23, 2024, at the jobsite: employees were exposed to an 11 foot fall hazard while installing siding on the edge of a flat roof, in that, fall protection was not used. |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2018-10-31 |
Emphasis | L: FALL, P: FALL |
Case Closed | 2021-02-17 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260453 B02 V |
Issuance Date | 2018-11-19 |
Current Penalty | 3880.0 |
Initial Penalty | 3880.0 |
Final Order | 2018-12-18 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift: a. On or about October 31, 2018, in an S-40 Genie High Reach aerial lift, an employee performing siding operations was not protected from an 18 feet fall hazard by use of a fall protection system. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260020 B01 |
Issuance Date | 2018-11-19 |
Abatement Due Date | 2018-12-14 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2018-12-18 |
Nr Instances | 1 |
Nr Exposed | 4 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.20(b)(1): A safety and health program was not initiated and maintained to provide compliance with the general safety and health provisions of the standard: a. On or about October 31, 2018, at the worksite, a safety and health program had not been initiated and maintained which addressed the following basic elements: 1. Management Commitment and Leadership A. Policy statement: goals established, issued, and communicated to employees. B. Program Reviewed Annually. C. Participation in safety meetings, inspections; agenda item in meet D. Adequate commitment of resources. E. Safety rules and procedures incorporated into site operations. F. Management observations of safety rules. 2. Assignment of Responsibility A. Safety designee on site, knowledgeable, and accountable. B. Supervisors' (including foremen) safety and health responsibilities understood. C. Employees adherence to safety rules. 3. Identification and Control of Hazards A. Periodic site inspection program involving supervisors. B. Preventive controls in place (PPE, Maintenance, Engineering Controls). C. Action taken to address hazards. D. Safety Committee, where appropriate. E. Technical reference materials available. 4. Training and Education A. Supervisors receive basic safety and health training. B. Specialized training taken when needed. C. Existence of an employee training program, which is ongoing and effective. 5. Recordkeeping and Hazard Analysis |
Citation ID | 03001 |
Citaton Type | Other |
Standard Cited | 19030019 C03 |
Issuance Date | 2019-03-22 |
Abatement Due Date | 2019-04-11 |
Current Penalty | 319.0 |
Initial Penalty | 319.0 |
Final Order | 2019-04-17 |
Nr Instances | 1 |
Nr Exposed | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1903.19(c)(3): The employer did not submit certification that abatement is complete for each cited violation, in addition to the information required by paragraph (h) of this section. a. On or about March 4, 2019, the employer did not submit abatement certification for a violation of 29 CFR 1926.20(b)(1) as required. This abatement was due on December 14, 2018. |
Date of last update: 03 May 2025
Sources: Florida Department of State