Search icon

CAMOR PLASTERING, INC. - Florida Company Profile

Company Details

Entity Name: CAMOR PLASTERING, INC.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

CAMOR PLASTERING, INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Active

The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness.

Date Filed: 26 Oct 2015 (10 years ago)
Last Event: NAME CHANGE AMENDMENT
Event Date Filed: 26 May 2016 (9 years ago)
Document Number: P15000087799
FEI/EIN Number 475416607

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 4434 VENUA AVE, WEST PALM BEACH, FL, 33406, US
Mail Address: 4434 VENUS AVE, WEST PALM BEACH, FL, 33406, US
ZIP code: 33406
County: Palm Beach
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
MORADEL CARLOS A President 4434 VENUS AVE, WEST PALM BEACH, FL, 33406
MORADEL CHRISTOPHER Vice President 4434 VENUA AVE, WEST PALM BEACH, FL, 33406
JOSEPH K. NOFIL, PA Agent 8217 W ATLANTIC BLVD, CORAL SPRINGS, FL, 33071

Events

Event Type Filed Date Value Description
NAME CHANGE AMENDMENT 2016-05-26 CAMOR PLASTERING, INC. -
CHANGE OF PRINCIPAL ADDRESS 2016-05-12 4434 VENUA AVE, WEST PALM BEACH, FL 33406 -

Documents

Name Date
ANNUAL REPORT 2024-03-17
ANNUAL REPORT 2023-02-24
ANNUAL REPORT 2022-02-23
ANNUAL REPORT 2021-03-14
ANNUAL REPORT 2020-03-16
ANNUAL REPORT 2019-02-10
ANNUAL REPORT 2018-02-17
ANNUAL REPORT 2017-02-12
Name Change 2016-05-26
AMENDED ANNUAL REPORT 2016-05-12

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
342226297 0418800 2017-04-05 4100 N. DIXIE HWY BUILDING #11, TOWNHOMES #89-92, OAKLAND PARK, FL, 33334
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2017-04-05
Emphasis L: FALL, P: FALL
Case Closed 2019-02-12

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2017-04-17
Abatement Due Date 2017-04-27
Current Penalty 1631.0
Initial Penalty 3259.0
Final Order 2017-06-02
Nr Instances 3
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units: On or about April 5, 2017, at the above addressed jobsite, employees were working from a tubular welded scaffold up to approximately 12 feet high without all platforms being fully planked, exposing the employees to fall hazards. Instance (1): 2nd tier of the scaffold on the back of the townhome not fully planked. Instance (2): 1st tier of the scaffold on the back of the townhome not fully planked. Instance (3): Side of the townhome 2nd tier not fully planked.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2017-04-17
Abatement Due Date 2017-04-27
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2017-06-02
Nr Instances 5
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: On or about April 5, 2017, at the above addressed jobsite, employees were working on a tubular welded scaffold without being trained by the employer on how to recognize scaffold hazardous conditions, exposing the employees to a fall hazards.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2017-04-17
Abatement Due Date 2017-04-27
Current Penalty 1358.0
Initial Penalty 2716.0
Final Order 2017-06-02
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: On or about April 5, 2017, at the above addressed jobsite, employees were working on a tubular welded scaffold up to approximately 16 feet high without the employer providing an access ladder, exposing the employees to fall hazards.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2017-04-17
Abatement Due Date 2017-04-27
Current Penalty 1358.0
Initial Penalty 2716.0
Final Order 2017-06-02
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: On or about April 5, 2017, at the above addressed jobsite, employees were working on a tubular welded scaffold up to approximately 16 feet high without all scaffold tiers having a side rail installed, exposing employees to fall hazards.
Citation ID 02001
Citaton Type Other
Standard Cited 19260095 A
Issuance Date 2017-04-17
Abatement Due Date 2017-04-27
Current Penalty 153.0
Initial Penalty 305.0
Final Order 2017-06-02
Nr Instances 5
Nr Exposed 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact: On or about April 5, 2017, at the above addressed jobsite, employees were applying stucco to the exterior of the new townhome under construction without utilizing gloves, exposing the employees to chemical irritations.
Citation ID 02002
Citaton Type Other
Standard Cited 19260451 H02 II
Issuance Date 2017-04-17
Abatement Due Date 2017-04-27
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2017-06-02
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: On or about April 5, 2017, at the above addressed jobsite, employees were working on a tubular welded scaffold up to approximately 12 feet high without installing toe boards, exposing the employees to struck-by hazards.

Date of last update: 03 Apr 2025

Sources: Florida Department of State