Entity Name: | STEEL IMAGE GENERAL CONTRACTORS INC |
Jurisdiction: | FLORIDA |
Filing Type: | Florida Profit Corporation |
Status: | Active |
Date Filed: | 08 Jan 2015 (10 years ago) |
Last Event: | AMENDMENT |
Event Date Filed: | 09 Nov 2018 (6 years ago) |
Document Number: | P15000002806 |
FEI/EIN Number | 47-2725326 |
Address: | 6017 PINE RIDGE ROAD, SUITE 265, NAPLES, FL 34119 |
Mail Address: | 6017 PINE RIDGE ROAD, SUITE 265, NAPLES, FL 34119 |
ZIP code: | 34119 |
County: | Collier |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
CATALAN, PATRICIA J | Agent | 6017 PINE RIDGE ROAD, SUITE 265, NAPLES, FL 34119 |
Name | Role | Address |
---|---|---|
CATALAN, PATRICIA J | President | 6017 PINE RIDGE ROAD SUITE 265, NAPLES, FL 34119 |
Name | Role | Address |
---|---|---|
CABRERA, CIRO CONTERAS | Vice President | 821 7TH ST SW, NAPLES, FL 34117 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
AMENDMENT | 2018-11-09 | No data | No data |
Name | Date |
---|---|
ANNUAL REPORT | 2024-04-18 |
ANNUAL REPORT | 2023-04-04 |
ANNUAL REPORT | 2022-04-03 |
ANNUAL REPORT | 2021-04-30 |
ANNUAL REPORT | 2020-05-22 |
ANNUAL REPORT | 2019-04-26 |
Amendment | 2018-11-09 |
ANNUAL REPORT | 2018-04-23 |
ANNUAL REPORT | 2017-04-24 |
ANNUAL REPORT | 2016-04-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345734768 | 0420600 | 2022-01-20 | 18240 BLUE EYE LOOP, FORT MYERS, FL, 33913 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1855080 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 I |
Issuance Date | 2022-03-24 |
Abatement Due Date | 2022-04-12 |
Current Penalty | 2237.4 |
Initial Penalty | 3729.0 |
Final Order | 2022-04-12 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Accident |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1)(i):Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. a) At the site, on or about 1/25/2022 and on days prior to, the scaffold planks were installed so that the space between the adjacent units were approximately 10-12 inches, exposing employees to fall hazards while performing drywall finishing work on the scaffold. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260454 A |
Issuance Date | 2022-03-24 |
Abatement Due Date | 2022-04-12 |
Current Penalty | 2610.6 |
Initial Penalty | 4351.0 |
Final Order | 2022-04-12 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.454(a):The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) At the site, on or about 1/25/2022 and on dates prior to, the employer did not have employees who performed work while on a scaffold trained by a qualified person in the subject matter, making them unable to recognize and understand how to control the hazards of working on the scaffold. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2021-09-29 |
Emphasis | L: FALL |
Case Closed | 2023-04-13 |
Related Activity
Type | Inspection |
Activity Nr | 1555651 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1555629 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1555638 |
Safety | Yes |
Type | Referral |
Activity Nr | 1816722 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2022-03-17 |
Current Penalty | 2900.8 |
Initial Penalty | 4144.0 |
Final Order | 2022-04-08 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about 09/28/2021, at 6098 Plana Cays Drive, Isles of Collier, Naples, Florida, the employer failed to ensure that a rolling scaffold was fully planked prior to allowing employees to work from it. |
Date of last update: 20 Feb 2025
Sources: Florida Department of State