Search icon

DAVID KNIGHT STUCCO INC - Florida Company Profile

Company Details

Entity Name: DAVID KNIGHT STUCCO INC
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

DAVID KNIGHT STUCCO INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 23 May 2013 (12 years ago)
Date of dissolution: 27 Sep 2019 (6 years ago)
Last Event: ADMIN DISSOLUTION FOR ANNUAL REPORT
Event Date Filed: 27 Sep 2019 (6 years ago)
Document Number: P13000045657
FEI/EIN Number 46-2952179

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 1410 VANDER AVE, PALM BAY, FL, 32909
Mail Address: 1410 VANDER AVE, PALM BAY, FL, 32909
ZIP code: 32909
County: Brevard
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
KNIGHT DAVID JR President 1410 VANDER AVE, PALM BAY, FL, 32909
KNIGHT DAVID T Vice President 3240 IDEAL AVE NE, PALM BAY, FL, 32905
KNIGHT DAVID JR Agent 1410 VANDER AVE, PALM BAY, FL, 32909

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2019-09-27 - -

Documents

Name Date
ANNUAL REPORT 2018-04-26
ANNUAL REPORT 2017-06-28
ANNUAL REPORT 2016-04-30
ANNUAL REPORT 2015-04-28
ANNUAL REPORT 2014-05-01
Domestic Profit 2013-05-23

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
341723286 0418800 2016-08-24 11368 SW PATTERSON ST, PORT SAINT LUCIE, FL, 34986
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2016-08-24
Emphasis L: FALL, P: FALL
Case Closed 2020-08-21

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2016-09-06
Abatement Due Date 2016-09-30
Current Penalty 2138.0
Initial Penalty 2138.0
Final Order 2016-11-14
Nr Instances 1
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about August 24, 2016, at the above addressed jobsite, two employees were performing stucco work while on the second level of a two tier tubular welded frame scaffold that was not fully planked at the level they were working at, exposing the employees to a fall hazard of approximately 12 feet.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 C02
Issuance Date 2016-09-06
Abatement Due Date 2016-09-30
Current Penalty 2138.0
Initial Penalty 2138.0
Final Order 2016-11-14
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: On or about August 24, 2016 employees were working from a scaffold that was missing base plates.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2016-09-06
Abatement Due Date 2016-09-30
Current Penalty 2138.0
Initial Penalty 2138.0
Final Order 2016-11-14
Nr Instances 1
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: On or about August 24, 2016, at the above addressed jobsite, two employees were performing stucco work while on the second level of a two tier tubular welded frame scaffold that did have guardrails all installed anywhere on the second level, exposing the employees to a fall hazard of approximately 12 feet.

Date of last update: 02 Apr 2025

Sources: Florida Department of State