Search icon

S & E CONCRETE INC - Florida Company Profile

Company Details

Entity Name: S & E CONCRETE INC
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

S & E CONCRETE INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Active

The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness.

Date Filed: 18 Apr 2013 (12 years ago)
Document Number: P13000035164
FEI/EIN Number 46-2573276

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 2105 Cork Oak St, SARASOTA, FL, 34232, US
Mail Address: 2105 Cork Oak St, SARASOTA, FL, 34232, US
ZIP code: 34232
County: Sarasota
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
GALVAN SALOME President 2105 Cork Oak St., SARASOTA, FL, 34232
GALVAN ESMERALDA Vice President 2105 Cork Oak St, SARASOTA, FL, 34232
GALVAN SALOME Agent 2105 Cork Oak St, SARASOTA, FL, 34232

Events

Event Type Filed Date Value Description
CHANGE OF PRINCIPAL ADDRESS 2014-03-13 2105 Cork Oak St, SARASOTA, FL 34232 -
CHANGE OF MAILING ADDRESS 2014-03-13 2105 Cork Oak St, SARASOTA, FL 34232 -
REGISTERED AGENT ADDRESS CHANGED 2014-03-13 2105 Cork Oak St, SARASOTA, FL 34232 -

Documents

Name Date
ANNUAL REPORT 2024-03-05
ANNUAL REPORT 2023-01-26
ANNUAL REPORT 2022-03-08
ANNUAL REPORT 2021-03-24
ANNUAL REPORT 2020-04-15
ANNUAL REPORT 2019-03-07
ANNUAL REPORT 2018-03-03
ANNUAL REPORT 2017-02-10
ANNUAL REPORT 2016-02-11
ANNUAL REPORT 2015-02-24

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340097872 0420600 2014-11-18 2672 TAMIAMI TRAIL, PORT CHARLOTTE, FL, 33952
Inspection Type Prog Related
Scope Partial
Safety/Health Safety
Close Conference 2014-11-18
Emphasis L: FALL, P: FALL, L: EISAOF
Case Closed 2015-01-08

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2014-12-10
Current Penalty 1020.0
Initial Penalty 1020.0
Final Order 2015-01-07
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) At the Birds In My Drawer construction in Port Charlotte Tampa- an employee was observed working from the second tier of a supported scaffold system that was not fully planked. The employee was exposed to a fall hazard of approximately 9 feet and 4 inches on or about November 18, 2014.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260451 C02
Issuance Date 2014-12-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-01-07
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) At the Birds In My Drawer construction in Port Charlotte Tampa- an employee was observed working from the second tier of a supported scaffold that did not have mud sills. The employee was exposed to a fall hazard of approximately 9 feet and 4 inches on or about November 18, 2014.
Citation ID 01001C
Citaton Type Serious
Standard Cited 19260451 C03
Issuance Date 2014-12-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-01-07
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(c)(3): Supported scaffold poles, legs, posts, frames, and uprights were not plumb and braced to prevent swaying and displacement. a) At the Birds In My Drawer construction in Port Charlotte Tampa- an employee was observed working from the second tier of a supported scaffold system that had crossbraces in only one side. The employee was exposed to a fall hazard of approximately 9 feet and 4 inches on or about November 18, 2014.

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
3973328308 2021-01-22 0455 PPP 2105 Cork Oak St, Sarasota, FL, 34232-6801
Loan Status Date 2021-07-13
Loan Status Paid in Full
Loan Maturity in Months 60
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 39828
Loan Approval Amount (current) 39828
Undisbursed Amount 0
Franchise Name -
Lender Location ID 456756
Servicing Lender Name Cross River Bank
Servicing Lender Address 885 Teaneck Rd, TEANECK, NJ, 07666-4546
Rural or Urban Indicator U
Hubzone N
LMI N
Business Age Description Existing or more than 2 years old
Project Address Sarasota, SARASOTA, FL, 34232-6801
Project Congressional District FL-17
Number of Employees 6
NAICS code 238110
Borrower Race Unanswered
Borrower Ethnicity Unknown/NotStated
Business Type Subchapter S Corporation
Originating Lender ID 456756
Originating Lender Name Cross River Bank
Originating Lender Address TEANECK, NJ
Gender Unanswered
Veteran Unanswered
Forgiveness Amount 39946.94
Forgiveness Paid Date 2021-06-15

Date of last update: 02 Apr 2025

Sources: Florida Department of State