Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2017-02-09
|
Emphasis |
P: FALL, L: FALL
|
Case Closed |
2020-09-28
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 I |
Issuance Date |
2017-04-04 |
Abatement Due Date |
2017-04-11 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Contest Date |
2017-06-19 |
Final Order |
2018-05-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary: On or about 2/9/2017, at 7601 Cavalia Dr, Davie, FL. Employees were exposed to a fall hazard of 14'-6" while working from tubular welded frame scaffolds that were not fully planked. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 E01 |
Issuance Date |
2017-04-04 |
Abatement Due Date |
2017-04-11 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Contest Date |
2017-06-19 |
Final Order |
2018-05-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. On or about 2/9/2017, at 7601 Cavalia Dr, Davie, FL. Employees were exposed to a fall hazard of 14'-6" while accessing working levels of tubular welded frame scaffolds that lacked an adequate access. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 |
Issuance Date |
2017-04-04 |
Abatement Due Date |
2017-04-11 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Contest Date |
2017-06-19 |
Final Order |
2018-05-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: On or about 2/9/2017, at 7601 Cavalia Dr, Davie, FL. Employees were exposed to a fall hazard of 14'-6" while working from tubular welded frame scaffolds without being protected from falling. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19260452 C02 |
Issuance Date |
2017-04-04 |
Abatement Due Date |
2017-04-11 |
Current Penalty |
3803.0 |
Initial Penalty |
3803.0 |
Contest Date |
2017-06-19 |
Final Order |
2018-05-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: On or about 2/9/2017, at 7601 Cavalia Dr, Davie, FL. Employees were exposed to a fall hazard of 14'-6" to a fall hazard while working from tubular welded frame scaffolds which lacked crossbraces. |
|
|