Search icon

CJS CONSTRUCTION, INC

Company Details

Entity Name: CJS CONSTRUCTION, INC
Jurisdiction: FLORIDA
Filing Type: Florida Profit Corporation
Status: Inactive
Date Filed: 08 Nov 2012 (12 years ago)
Date of dissolution: 06 Sep 2013 (11 years ago)
Last Event: VOLUNTARY DISSOLUTION
Event Date Filed: 06 Sep 2013 (11 years ago)
Document Number: P12000093443
FEI/EIN Number 46-1382019
Address: 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065
Mail Address: 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065
ZIP code: 33065
County: Broward
Place of Formation: FLORIDA

Agent

Name Role Address
SANTIAGO, CORY J Agent 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065

President

Name Role Address
SANTIAGO, CORY J President 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065

Vice Treasurer

Name Role Address
SANTIAGO, CORY J Vice Treasurer 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065

Director

Name Role Address
SANTIAGO, CORY J Director 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065

Secretary

Name Role Address
Amaya Castro, Nicolas Secretary 3504 NW 84TH TERR, CORAL SPRINGS, FL 33065

Events

Event Type Filed Date Value Description
VOLUNTARY DISSOLUTION 2013-09-06 No data No data

Documents

Name Date
VOLUNTARY DISSOLUTION 2013-09-06
ANNUAL REPORT 2013-02-07
Domestic Profit 2012-11-08

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339134140 0418800 2013-06-20 4100 NORTH FEDERAL HIGHWAY, FORT LAUDERDALE, FL, 33306
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2013-07-12
Emphasis L: FALL, P: FALL
Case Closed 2014-12-18

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2013-07-24
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2013-08-23
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about June 20, 2013, at the above addressed jobsite, employees were working on a scaffold that was not fully planked.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 C02
Issuance Date 2013-07-24
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2013-08-23
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: On or about June 20, 2013, at the above addressed jobsite, an employee was on a scaffold and the uprights which were on sandy soil, did not have mudsills.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2013-07-24
Current Penalty 1200.0
Initial Penalty 1200.0
Final Order 2013-08-23
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: On or about June 20, 2013, at the above addressed jobsite, employees did not have a ladder to access the scaffold.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260451 G04
Issuance Date 2013-07-24
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2013-08-23
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(4): Guardrail systems installed to meet the requirements of this section did not comply with the provisions listed in subparagraphs (i) through (xv) of this paragraph: On or about June 20, 2013, at the above addressed jobsite, an employee was working on a scaffold which did not have guardrails.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260452 C02
Issuance Date 2013-07-24
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2013-08-23
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: On or about June 20, 2013, at the above referenced jobsite, the prefabricated frame scaffold did not have cross braces.
339124240 0418800 2013-06-17 1355 N. STATE ROAD 7, LAUDERHILL, FL, 33313
Inspection Type Prog Related
Scope Partial
Safety/Health Safety
Close Conference 2013-06-17
Emphasis L: FALL
Case Closed 2014-12-18

Related Activity

Type Inspection
Activity Nr 912426
Safety Yes
Type Inspection
Activity Nr 912384
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260453 B02 IV
Issuance Date 2013-08-14
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2013-10-02
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.453(b)(2)(iv): Employee(s) working in an aerial lift were not standing firmly on the floor of the basket: On or about 6/17/2013, an employee installing metal framing from inside an aerial lift was approximately 16 feet above ground level while standing on the midrail of the aerial lift.
339025579 0418800 2013-04-25 1515-19 NW 40TH AVE, LAUDERHILL, FL, 33313
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2013-04-25
Emphasis L: EISAOF, L: FALL, P: FALL
Case Closed 2015-01-06

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260453 B02 V
Issuance Date 2013-07-19
Current Penalty 1200.0
Initial Penalty 2000.0
Final Order 2013-08-07
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.453(b)(2)(v): A body belt was not worn and/or a lanyard was not attached to the boom or basket when working from an aerial lift: On or about May 25, 2013, at the above addressed jobsite, employees were engaged in exterior molding installation work from an aerial lift at approximately 16 feet above ground level without a means of fall protection.

Date of last update: 22 Feb 2025

Sources: Florida Department of State