Search icon

ROBBY BAILEY CONSTRUCTION INC. - Florida Company Profile

Company Details

Entity Name: ROBBY BAILEY CONSTRUCTION INC.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

ROBBY BAILEY CONSTRUCTION INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 19 Sep 2012 (13 years ago)
Date of dissolution: 28 Sep 2018 (7 years ago)
Last Event: ADMIN DISSOLUTION FOR ANNUAL REPORT
Event Date Filed: 28 Sep 2018 (7 years ago)
Document Number: P12000079387
FEI/EIN Number 46-1044274

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 6619 LURE CT, LAKE WALES, FL, 33898, US
Mail Address: 6619 LURE CT, LAKE WALES, FL, 33898, US
ZIP code: 33898
County: Polk
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
BAILEY ROBBY L President 6619 LURE CT, LAKE WALES, FL, 33898
BAILEY ROBBY L Director 6619 LURE CT, LAKE WALES, FL, 33898
BAILEY ROBBY L Agent 6619 LURE CT, LAKE WALES, FL, 33898

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2018-09-28 - -
CHANGE OF PRINCIPAL ADDRESS 2016-04-25 6619 LURE CT, LAKE WALES, FL 33898 -
CHANGE OF MAILING ADDRESS 2016-04-25 6619 LURE CT, LAKE WALES, FL 33898 -
REGISTERED AGENT ADDRESS CHANGED 2016-04-25 6619 LURE CT, LAKE WALES, FL 33898 -

Documents

Name Date
ANNUAL REPORT 2017-03-17
ANNUAL REPORT 2016-04-25
ANNUAL REPORT 2015-04-20
ANNUAL REPORT 2014-05-05
ANNUAL REPORT 2013-04-24
Domestic Profit 2012-09-19

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
341229466 0420600 2016-02-04 1581 BERWICK DR, CHAMPIONS GATE, FL, 33896
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2016-02-04
Emphasis L: FALL, P: FALL
Case Closed 2020-11-20

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260451 B02
Issuance Date 2016-02-19
Current Penalty 1400.0
Initial Penalty 2800.0
Final Order 2016-03-17
Nr Instances 1
Nr Exposed 3
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide: a. At the site, employees were exposed to a fall hazard, in that, a 6 inch wide plank was used as a working platform bridging two mobile scaffolds during framing work, on or about 02/04/2016.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260452 W01
Issuance Date 2016-02-19
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-03-17
Nr Instances 1
Nr Exposed 3
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(w)(1): The mobile scaffold was not braced by cross, horizontal, or diagonal braces, or combination thereof, to prevent racking or collapse of the scaffold and secure vertical members together laterally so as to automatically square and align the vertical members: a. At the site, employees were exposed to a fall hazard, in that, two mobile scaffolds two frames high, were not provided with a cross brace at the one side of the top frame. A 6 inch wide plank was used to bridge the mobile scaffolds without been braced or otherwise secured in any way from displacement while in use, on or about 02/04/2016.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260452 W02
Issuance Date 2016-02-19
Current Penalty 1400.0
Initial Penalty 2800.0
Final Order 2016-03-17
Nr Instances 1
Nr Exposed 3
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(w)(2): Scaffold casters and wheels were not locked with positive wheel and/or wheel and swivel locks, or equivalent means, to prevent movement of the scaffold while the scaffold was used in a stationary manner: a. At the site, employees were exposed to a fall hazard, in that, two mobile scaffolds two frames high used during framing work did not have the 8 wheels locked while employees were on the mobile scaffolds, on or about 02/04/2016.
Citation ID 01003A
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2016-02-19
Abatement Due Date 2016-04-06
Current Penalty 1400.0
Initial Penalty 2800.0
Final Order 2016-03-17
Nr Instances 1
Nr Exposed 5
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a. At the site, employees were exposed to a fall hazard, in that, during framing work employees were not provided training and education when using two mobile scaffolds, two frames high with a 6 inches wide plank bridging the two mobile scaffolds, on or about 02/04/2016.
Citation ID 01003B
Citaton Type Serious
Standard Cited 19260454 B
Issuance Date 2016-02-19
Abatement Due Date 2016-04-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-03-17
Nr Instances 1
Nr Exposed 5
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question: a. At the site, employees were exposed to a fall hazard, in that, employees were not provided training and education on scaffold erection where two mobile scaffolds, two frames high with a 6 inches wide plank bridging the two mobile scaffolds were erected during framing work, on or about 02/04/2016.
Citation ID 02001
Citaton Type Other
Standard Cited 19260020 B01
Issuance Date 2016-02-19
Abatement Due Date 2016-04-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-03-17
Nr Instances 1
Nr Exposed 11
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.20(b)(1): A safety and health program was not initiated and/or maintained to provide compliance with the general safety and health provisions of the standard: a. The employer did not develop and implement a safety and health program to address the company policy on safety as well as the employer/employee responsibilities, on or about 02/08/2016.

Date of last update: 02 Apr 2025

Sources: Florida Department of State