Search icon

SANTIAGO FAJARDO MASONRY, INC - Florida Company Profile

Company Details

Entity Name: SANTIAGO FAJARDO MASONRY, INC
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

SANTIAGO FAJARDO MASONRY, INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 06 Mar 2012 (13 years ago)
Date of dissolution: 24 Sep 2021 (4 years ago)
Last Event: ADMIN DISSOLUTION FOR ANNUAL REPORT
Event Date Filed: 24 Sep 2021 (4 years ago)
Document Number: P12000022713
FEI/EIN Number 59-3705588

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 11681 Tundra Dr, North Fort Myers, FL, 33917, US
Mail Address: 11681 Tundra Dr, North Fort Myers, FL, 33917, US
ZIP code: 33917
County: Lee
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
FAJARDO SANTIAGO President 11681 Tundra Dr, North Fort Myers, FL, 33917
Fajardo Orfanel Vice President 11681 Tundra Dr, North Fort Myers, FL, 33917
FAJARDO SANTIAGO Agent 11681 Tundra Dr, North Fort Myers, FL, 33917

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2021-09-24 - -
REGISTERED AGENT ADDRESS CHANGED 2019-06-10 11681 Tundra Dr, North Fort Myers, FL 33917 -
REINSTATEMENT 2019-06-10 - -
CHANGE OF PRINCIPAL ADDRESS 2019-06-10 11681 Tundra Dr, North Fort Myers, FL 33917 -
CHANGE OF MAILING ADDRESS 2019-06-10 11681 Tundra Dr, North Fort Myers, FL 33917 -
ADMIN DISSOLUTION FOR ANNUAL REPORT 2018-09-28 - -
REGISTERED AGENT NAME CHANGED 2017-05-10 FAJARDO, SANTIAGO -
REINSTATEMENT 2017-05-10 - -
ADMIN DISSOLUTION FOR ANNUAL REPORT 2013-09-27 - -

Documents

Name Date
ANNUAL REPORT 2020-07-30
REINSTATEMENT 2019-06-10
REINSTATEMENT 2017-05-10
Domestic Profit 2012-03-06

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
341349363 0420600 2016-03-23 25252 CORDERA POINT DRIVE, BONITA SPRINGS, FL, 34135
Inspection Type Prog Related
Scope Complete
Safety/Health Safety
Close Conference 2016-03-23
Emphasis L: FALL, P: FALL
Case Closed 2017-07-13

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2016-04-15
Current Penalty 2400.0
Initial Penalty 2400.0
Final Order 2016-05-12
Nr Instances 1
Nr Exposed 10
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. At the jobsite, the tubular welded scaffolding employees were working from was missing approximately 9 inches of planking on the working levels, exposing the employees to 6 foot 4 inch fall hazard, on or about 3/23/16.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 B04
Issuance Date 2016-04-15
Current Penalty 2400.0
Initial Penalty 2400.0
Final Order 2016-05-12
Nr Instances 1
Nr Exposed 10
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(4): Each end of a platform, unless cleated or otherwise restrained by hooks or equivalent means, shall extend over the centerline of its support at least 6 inches (15 cm): a. At the jobsite, the planking on the tubular welded scaffolding employees were working from extended 3-4 inches past the support frame, exposing the employees to 6 foot 4 inch fall hazard, on or about 3/23/16.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 F03
Issuance Date 2016-04-15
Current Penalty 2400.0
Initial Penalty 2400.0
Final Order 2016-05-12
Nr Instances 1
Nr Exposed 10
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a. At the jobsite, the scaffolding employees were working from had at least 4 scaffold frames with broken welds and 4 pieces of planking had large and long cracks in them, exposing the employees to 6 foot 4 inch fall hazard, on or about 3/23/16.
Citation ID 01004A
Citaton Type Serious
Standard Cited 19260451 F07
Issuance Date 2016-04-15
Abatement Due Date 2016-04-27
Current Penalty 2400.0
Initial Penalty 2400.0
Final Order 2016-05-12
Nr Instances 1
Nr Exposed 10
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration: a. At the jobsite, employees erected, dismantled and moved tubular welded scaffolding without the guidance and supervision of a competent person, exposing the emp0loyees to a 6 foot 4 inch fall hazard, on or about 3/23/16.
Citation ID 01004B
Citaton Type Serious
Standard Cited 19260454 B
Issuance Date 2016-04-15
Abatement Due Date 2016-04-27
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-05-12
Nr Instances 1
Nr Exposed 10
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question: a. At the jobsite, untrained employees erected, dismantled, moved, and worked from tubular welded scaffolding without the being trained on the hazards associated with scaffolding, exposing the employees to a 6 foot 4 inch fall hazard, on or about 3/23/16.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260452 C02
Issuance Date 2016-04-15
Current Penalty 2400.0
Initial Penalty 2400.0
Final Order 2016-05-12
Nr Instances 1
Nr Exposed 10
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a. At the jobsite, the tubular welded scaffolding frames was not braced along the front-outer sections of the scaffolding, exposing employees to a 6 foot 4 inch fall hazard, on or about 3/23/16.

Date of last update: 01 Apr 2025

Sources: Florida Department of State