Entity Name: | PUEBLA STUCCO INC |
Jurisdiction: | FLORIDA |
Filing Type: |
Domestic Profit
PUEBLA STUCCO INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act. |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 01 Mar 2011 (14 years ago) |
Last Event: | REINSTATEMENT |
Event Date Filed: | 29 Apr 2016 (9 years ago) |
Document Number: | P11000021235 |
FEI/EIN Number |
275348256
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 1111 N FERRELL ST, PLANT CITY, FL, 33563 |
Mail Address: | 1111 N FERRELL ST, PLANT CITY, FL, 33563 |
ZIP code: | 33563 |
County: | Hillsborough |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
NERI LEZAMA TEODORO | President | 1111 N FERRELL ST, PLANT CITY, FL, 33563 |
NERI LEZAMA TEODORO | Agent | 1111 N FERRELL ST, PLANT CITY, FL, 33563 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
REINSTATEMENT | 2016-04-29 | - | - |
REGISTERED AGENT NAME CHANGED | 2016-04-29 | NERI LEZAMA, TEODORO | - |
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2015-09-25 | - | - |
Document Number | Status | Case Number | Name of Court | Date of Entry | Expiration Date | Amount Due | Plaintiff |
---|---|---|---|---|---|---|---|
J22000305351 | ACTIVE | 19-011-D3 | LEON COUNTY | 2022-03-01 | 2027-06-28 | $151,884.28 | DFS DIVISION OF WORKERS COMPENSATION, 200 EAST GAINES STREET, TALLAHASSEE, FL 32399-4228 |
Name | Date |
---|---|
ANNUAL REPORT | 2024-03-20 |
ANNUAL REPORT | 2023-04-06 |
ANNUAL REPORT | 2022-03-19 |
ANNUAL REPORT | 2021-04-07 |
ANNUAL REPORT | 2020-03-24 |
ANNUAL REPORT | 2019-04-30 |
ANNUAL REPORT | 2018-03-01 |
ANNUAL REPORT | 2017-03-14 |
REINSTATEMENT | 2016-04-29 |
ANNUAL REPORT | 2014-04-30 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
341470367 | 0420600 | 2016-05-06 | VICTORIA STREET, BRANDON, FL, 33510 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2016-06-10 |
Current Penalty | 1200.0 |
Initial Penalty | 2000.0 |
Final Order | 2016-07-07 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) (a) At the site - tubular welded frame scaffold system that was also missing endrails and midrails was not fully planked exposing employees to a 18 foot fall hazard, on or about 05/06/2016. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 B02 II |
Issuance Date | 2016-06-10 |
Current Penalty | 1200.0 |
Initial Penalty | 2000.0 |
Final Order | 2016-07-07 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(2)(ii): When walkways between scaffold sections are less than 18 inches wide, employees were not protected from falls by guardrail systems or personal fall arrest systems: (a) At the site - the employee was not provided fall protection while working from a platform consisting of one plank exposing employee to an 18 foot fall, on or about 05/06/2016. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 E01 |
Issuance Date | 2016-06-10 |
Current Penalty | 1200.0 |
Initial Penalty | 2000.0 |
Final Order | 2016-07-07 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. (a) At the site - employees were not provided a ladder for access and egress to the tubular welded frame scaffold platform, on or about 05/06/2016. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2016-06-10 |
Current Penalty | 1080.0 |
Initial Penalty | 1800.0 |
Final Order | 2016-07-07 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level. (a) At the site - employees were exposed to an 18 foot fall while working from the tubular welded frame scaffold system that was missing endrails and midrails, on or about 05/06/2016. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260451 F03 |
Issuance Date | 2016-06-10 |
Abatement Due Date | 2016-07-07 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2016-07-07 |
Nr Instances | 1 |
Nr Exposed | 2 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift and after any occurrence which could affect a scaffold's structural integrity: (a) At the site - scaffold planking components were not inspected for damages such as but not limited to missing scaffold components such as planking, ladder and fall protection on or about 05/06/2016. |
Citation ID | 02002 |
Citaton Type | Other |
Standard Cited | 19260503 A01 |
Issuance Date | 2016-06-10 |
Abatement Due Date | 2016-07-07 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2016-07-07 |
Nr Instances | 1 |
Nr Exposed | 2 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards: (a) At the site - employees were not trained to recognize the hazards of working from an unguarded tubular welded frame scaffold system exposing them to an 18 foot fall, on or about 05/06/2016. |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Health |
Close Conference | 2012-08-10 |
Emphasis | L: FALL |
Case Closed | 2017-11-01 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2012-08-23 |
Abatement Due Date | 2012-08-24 |
Current Penalty | 1200.0 |
Initial Penalty | 1200.0 |
Final Order | 2012-09-18 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. West side of building - an employee was exposed to a 6'6" fall hazard, in that, the deck was not fully planked. An employee was required to work from a single plank platform. Violation observed on or about 08/08/12. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 E01 |
Issuance Date | 2012-08-23 |
Abatement Due Date | 2012-08-30 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-18 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a. West side of building - employees were exposed to a 14'-8" fall hazard, in that, a ladder was not provided. Violation observed on or about 08/10/2012. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 F15 |
Issuance Date | 2012-08-23 |
Abatement Due Date | 2012-08-24 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-18 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(f)(15): Ladders were used on scaffolds to increase the working level height of employees: without satisfying the criteria of subparagraphs (i) - (iv) of this paragraph: a. West side of building - Employees were exposed to a 14'-8" fall hazard, in that, an A-frame step ladder and a scaffold horse frame were used on a scaffold platform to increase the working height as employees installed the architectural foam band. Violation observed on or about 08/08/12. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260451 G04 I |
Issuance Date | 2012-08-23 |
Abatement Due Date | 2012-08-24 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2012-09-18 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms: a. West side of building - top and mid rails were missing from the open end of the scaffold. In addition, mid-rails were missing on the several scaffold sections. Violation observed on or about 08/08/12. |
Date of last update: 02 May 2025
Sources: Florida Department of State