Search icon

J. CICERO MASONRY, INC. - Florida Company Profile

Company Details

Entity Name: J. CICERO MASONRY, INC.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

J. CICERO MASONRY, INC. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 15 Oct 2010 (15 years ago)
Date of dissolution: 14 Apr 2019 (6 years ago)
Last Event: VOLUNTARY DISSOLUTION
Event Date Filed: 14 Apr 2019 (6 years ago)
Document Number: P10000085223
FEI/EIN Number 300648751

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 262 CARSWELL AVENUE, HOLLY HILL, FL, 32117
Mail Address: 262 CARSWELL AVENUE, HOLLY HILL, FL, 32117
ZIP code: 32117
County: Volusia
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
Cicero John M President 262 CARSWELL AVENUE, HOLLY HILL, FL, 32117
Cicero John Agent 262 CARSWELL AVENUE, HOLLY HILL, FL, 32117

Events

Event Type Filed Date Value Description
VOLUNTARY DISSOLUTION 2019-04-14 - -
REGISTERED AGENT NAME CHANGED 2015-01-16 Cicero, John -
AMENDMENT 2012-11-19 - -

Debts

Document Number Status Case Number Name of Court Date of Entry Expiration Date Amount Due Plaintiff
J19000178572 LAPSED 502018CA001473XXXXMBAF FIFTEENTH JUDICIAL CIRCUIT 2019-03-07 2024-03-11 $2,628.00 TITAN FLORIDA LLC, 455 FAIRWAY DRIVE, DEERFIELD BEACH, FLORIDA 33441
J19000033298 LAPSED 502018CA001473XXXXMBAF FIFTEENTH JUDICIAL COURT 2019-01-14 2024-01-15 $40,144.97 TITAN FLORIDA, LLC, 455 FAIRWAY DRIVE, DEERFIELD BEACH, FLORIDA 33441

Documents

Name Date
VOLUNTARY DISSOLUTION 2019-04-14
ANNUAL REPORT 2018-06-08
ANNUAL REPORT 2017-03-01
ANNUAL REPORT 2016-02-10
ANNUAL REPORT 2015-01-16
AMENDED ANNUAL REPORT 2014-09-15
ANNUAL REPORT 2014-04-21
ANNUAL REPORT 2013-04-30
Amendment 2012-11-19
ANNUAL REPORT 2012-04-16

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340873496 0420600 2015-08-25 777 S. CENTRAL AVE., OVIEDO, FL, 32765
Inspection Type Complaint
Scope Complete
Safety/Health Safety
Close Conference 2015-08-25
Emphasis L: FALL
Case Closed 2018-10-31

Related Activity

Type Complaint
Activity Nr 1013523
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19101200 E01
Issuance Date 2015-10-23
Abatement Due Date 2015-11-12
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2016-01-06
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met. a. At the new Oviedo fire station jobsite, the employer did not have a hazard communication program to address hazards associated with the use of chemical products such as Argos masonry and mortar mix which contained silica and hexavalent chromium exposing the employee to a contact hazard, on or about 8/28/2015.
Citation ID 01002
Citaton Type Serious
Standard Cited 19101200 H01
Issuance Date 2015-10-23
Abatement Due Date 2015-11-04
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2016-01-06
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area a. At the new Oviedo fire station jobsite, the employee mixing dry mortar mix which contained silica and hexavalent chromium, was exposed a contact hazard, on or about 8/25/2105.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260102 A01
Issuance Date 2015-10-23
Abatement Due Date 2015-11-02
Current Penalty 2000.0
Initial Penalty 2000.0
Final Order 2016-01-06
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. a. At the new Oviedo fire station jobsite, an employee assigned to mix mortar was exposed to eye and face injuries, in that safety glasses were not provided, on or about 8/25/2015.
Citation ID 02001
Citaton Type Other
Standard Cited 19100178 L04 III
Issuance Date 2015-10-23
Abatement Due Date 2015-12-11
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-01-06
Nr Instances 1
Nr Exposed 8
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: a. At the new Oviedo fire station jobsite, an evaluation of the powered industrial truck operator's performance had not been conducted for 4 years, exposing employees to a struck by, on or about 8/25/2015.
Citation ID 02002
Citaton Type Other
Standard Cited 19260404 F06
Issuance Date 2015-10-23
Abatement Due Date 2015-11-02
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-01-06
Nr Instances 1
Nr Exposed 9
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous. a. At the new Oviedo fire station jobsite, an extension cord used to provide power to tools had a missing ground prong, exposing employees to a shock hazard, on or about 8/25/2015.
340869288 0420600 2015-08-19 735 S. CENTRAL AVE., OVIEDO, FL, 32765
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2015-08-19
Emphasis L: FALL
Case Closed 2022-12-30

Related Activity

Type Complaint
Activity Nr 1008949
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2015-09-24
Current Penalty 4900.0
Initial Penalty 4900.0
Final Order 2015-12-09
Nr Instances 1
Nr Exposed 6
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about 08/19/2015, at the job site - employees working from a scaffold to conduct masonry work were exposed to about a 14 feet and an 13 feet 5 inch fall hazard, in that, the scaffold was not fully planked.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 G04 I
Issuance Date 2015-09-24
Current Penalty 4900.0
Initial Penalty 4900.0
Final Order 2015-12-09
Nr Instances 1
Nr Exposed 6
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: a. On or about 08/19/2015, at the job site - employees were exposed to a 14 feet and an 13 feet 5 inch fall hazards, in that, the scaffold was not equipped with all the necessary guardrails.

Date of last update: 01 Apr 2025

Sources: Florida Department of State