Inspection Type |
Complaint
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2013-05-24
|
Emphasis |
L: EISAX, L: EISAOF, L: FORKLIFT, N: AMPUTATE
|
Case Closed |
2013-08-30
|
Related Activity
Type |
Complaint |
Activity Nr |
811714 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19100147 C04 I |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-06-05 |
Current Penalty |
2100.0 |
Initial Penalty |
3500.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Press Brake Area - No procedures were developed for the Standard Industrial Corp 1000 ton hydraulic press brake, on or about April 17, 2013. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19100147 C07 IV |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-07-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished: a) Facility-wide - Lock out tag out training was not documented and certified, on or about April 17, 2013. |
|
Citation ID |
01002A |
Citaton Type |
Serious |
Standard Cited |
19100178 Q01 |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-06-05 |
Current Penalty |
1071.0 |
Initial Penalty |
1785.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.178(q)(1): Any power-operated industrial truck not in safe operating condition was not taken out of service, and/or repairs were not made by authorized personnel: a) Building 3 - The Daewoo D-150 forklift had worn and damaged inflatable rear tires, on or about April 5, 2013. |
|
Citation ID |
01002B |
Citaton Type |
Serious |
Standard Cited |
19100178 Q07 |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-06-05 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.178(q)(7): Industrial trucks were not examined before being placed in service: a) Building 3 - The Daewoo D-150 forklift had not been inspected daily for 1.5 months, on or about April 5, 2013. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19100212 A03 II |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-06-05 |
Current Penalty |
2940.0 |
Initial Penalty |
4900.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) Press Brake Area - Standard Industrial Corp 1000 ton hydraulic press brake, on or about April 5, 2013. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19100132 D02 |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-07-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
20 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.132(d)(2): The employer did not verify, through a written certification, that the required workplace hazard assessment had been performed: a) Facility-wide - No written certification was developed, on or about April 5, 2013. |
|
Citation ID |
02002 |
Citaton Type |
Other |
Standard Cited |
19100134 C02 I |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-07-01 |
Current Penalty |
420.0 |
Initial Penalty |
700.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
4 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.134(c)(2)(i): Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible: a) Facility-wide - Appendix D was not provided to voluntary respirator users, on or about April 17, 2013. |
|
Citation ID |
02003 |
Citaton Type |
Other |
Standard Cited |
19100134 C02 II |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-07-01 |
Current Penalty |
420.0 |
Initial Penalty |
700.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.134(c)(2)(ii): The employer did not establish and implement those elements of a written program necessary to ensure that any employee using a respirator voluntarily was medically able to use that respirator, and that the respirator was cleaned, stored, and maintained so that its use does not present a health hazard to the user: a) Facility-wide - No written program was developed to incorporate medical evaluations, on or about April 17, 2013. |
|
Citation ID |
02004 |
Citaton Type |
Other |
Standard Cited |
19100178 L06 |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-06-05 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.178(l)(6): The employer did not certify that each operator has been trained and evaluated as required by this paragraph (l): a) Facility-wide - Forklift operators were not certified, on or about April 5, 2013. |
|
Citation ID |
02005 |
Citaton Type |
Other |
Standard Cited |
19101200 E01 |
Issuance Date |
2013-06-05 |
Abatement Due Date |
2013-07-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-06-28 |
Nr Instances |
1 |
Nr Exposed |
20 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) Facility-wide - No written program was developed and tungsten carbide and cobalt were used, on or about April 5, 2013. |
|
|