Search icon

ADVANCE BUILDERS CONTRACTORS, CORP. - Florida Company Profile

Company Details

Entity Name: ADVANCE BUILDERS CONTRACTORS, CORP.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

ADVANCE BUILDERS CONTRACTORS, CORP. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 10 May 2006 (19 years ago)
Date of dissolution: 20 Mar 2020 (5 years ago)
Last Event: VOLUNTARY DISSOLUTION
Event Date Filed: 20 Mar 2020 (5 years ago)
Document Number: P06000066052
FEI/EIN Number 205638799

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 734 NW 163 Avenue, Pembroke Pines, FL, 33028, US
Mail Address: 734 NW 163 Avenue, Pembroke Pines, FL, 33028, US
ZIP code: 33028
County: Broward
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
VELEZ-MAYMI MIGUEL A President 734 NW 163 AVE, PEMBROKE PINES, FL, 33028
VELEZ-MAYMI MIGUEL A Agent 734 NW 163 AVE, PEMBROKE PINES, FL, 33028

Events

Event Type Filed Date Value Description
VOLUNTARY DISSOLUTION 2020-03-20 - -
CHANGE OF PRINCIPAL ADDRESS 2019-05-01 734 NW 163 Avenue, Pembroke Pines, FL 33028 -
CHANGE OF MAILING ADDRESS 2019-05-01 734 NW 163 Avenue, Pembroke Pines, FL 33028 -
REGISTERED AGENT ADDRESS CHANGED 2019-05-01 734 NW 163 AVE, PEMBROKE PINES, FL 33028 -
REGISTERED AGENT NAME CHANGED 2009-04-19 VELEZ-MAYMI, MIGUEL APRES -

Documents

Name Date
VOLUNTARY DISSOLUTION 2020-03-20
ANNUAL REPORT 2020-01-29
ANNUAL REPORT 2019-05-01
ANNUAL REPORT 2018-03-30
ANNUAL REPORT 2017-04-29
ANNUAL REPORT 2016-04-29
ANNUAL REPORT 2015-04-22
ANNUAL REPORT 2014-04-24
ANNUAL REPORT 2013-04-27
ANNUAL REPORT 2012-04-13

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339827966 0418800 2014-06-26 117 SOUTH GORDON ROAD, FORT LAUDERDALE, FL, 33301
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2014-06-26
Emphasis L: FALL, P: FALL
Case Closed 2014-08-04

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2014-07-18
Abatement Due Date 2014-08-06
Current Penalty 720.0
Initial Penalty 1200.0
Final Order 2014-08-04
Nr Instances 1
Nr Exposed 2
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about June 27, 2014, at the above addressed jobsite, two employees were laying brick from a scaffold which was not fully planked.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2014-07-18
Abatement Due Date 2014-08-06
Current Penalty 720.0
Initial Penalty 1200.0
Final Order 2014-08-04
Nr Instances 1
Nr Exposed 2
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: On or about June 27, 2014, at the above addressed jobsite, two employees did not have a safe means of access to the scaffold platform.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 F03
Issuance Date 2014-07-18
Abatement Due Date 2014-08-06
Current Penalty 720.0
Initial Penalty 1200.0
Final Order 2014-08-04
Nr Instances 1
Nr Exposed 2
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: On or about June 27, 2014, at the above addressed jobsite, a scaffold was not inspected prior to commencing work.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260451 F07
Issuance Date 2014-07-18
Abatement Due Date 2014-08-06
Current Penalty 720.0
Initial Penalty 1200.0
Final Order 2014-08-04
Nr Instances 1
Nr Exposed 2
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities were not performed only by experienced and trained employees selected for such work by the competent person: On or about June 27, 2014, at the above addressed jobsite, a scaffold was erected by employees without the supervision of a competent person.

Date of last update: 01 May 2025

Sources: Florida Department of State