Search icon

E & M MIAMI CONTRACTOR, CORP. - Florida Company Profile

Company Details

Entity Name: E & M MIAMI CONTRACTOR, CORP.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

E & M MIAMI CONTRACTOR, CORP. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 14 Dec 2005 (19 years ago)
Date of dissolution: 27 Sep 2019 (6 years ago)
Last Event: ADMIN DISSOLUTION FOR ANNUAL REPORT
Event Date Filed: 27 Sep 2019 (6 years ago)
Document Number: P05000163355
FEI/EIN Number 205016703

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 175 FONTAINEBLEAU BLVD, 2G2, MIAMI, FL, 33172, US
Mail Address: 175 FONTAINEBLEAU BLVD, 2G2, MIAMI, FL, 33172, US
ZIP code: 33172
County: Miami-Dade
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
MIRANDA MARVIN A President 6020 GRIFFIN ROAD, DAVIE, FL, 33314
MIRANDA MARVIN A Director 6020 GRIFFIN ROAD, DAVIE, FL, 33314
MIRANDA KENNELL A Vice President 6020 GRIFFIN ROAD, DAVIE, FL, 33314
MIRANDA KENNELL A Director 6020 GRIFFIN ROAD, DAVIE, FL, 33314
MIRANDA MARVIN A Agent 175 FONTAINEBLEAU BLVD, 2G2, MIAMI, FL, 33172

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2019-09-27 - -
REGISTERED AGENT ADDRESS CHANGED 2018-03-01 175 FONTAINEBLEAU BLVD, 2G2, MIAMI, FL 33172 -
CHANGE OF PRINCIPAL ADDRESS 2018-03-01 175 FONTAINEBLEAU BLVD, 2G2, MIAMI, FL 33172 -
CHANGE OF MAILING ADDRESS 2018-03-01 175 FONTAINEBLEAU BLVD, 2G2, MIAMI, FL 33172 -
REINSTATEMENT 2014-04-15 - -
PENDING REINSTATEMENT 2014-04-15 - -
REGISTERED AGENT NAME CHANGED 2014-04-15 MIRANDA, MARVIN A -
ADMIN DISSOLUTION FOR ANNUAL REPORT 2011-09-23 - -
CANCEL ADM DISS/REV 2007-03-09 - -
ADMIN DISSOLUTION FOR ANNUAL REPORT 2006-09-15 - -

Debts

Document Number Status Case Number Name of Court Date of Entry Expiration Date Amount Due Plaintiff
J19000506939 LAPSED 18-14257 CA 01 MIAMI DADE CIRCUIT COURT 2019-06-11 2024-07-31 $166843.43 TRIUMPH CONSTRUCTION & REMODELING SERVICES, INC., 1530 NW 98TH CT., SUITE 103A, DORAL, FLORIDA 33172

Documents

Name Date
ANNUAL REPORT 2018-03-01
ANNUAL REPORT 2017-05-01
ANNUAL REPORT 2016-03-01
ANNUAL REPORT 2015-05-01
REINSTATEMENT 2014-04-15
ANNUAL REPORT 2010-03-24
ANNUAL REPORT 2009-01-09
ANNUAL REPORT 2008-01-08
REINSTATEMENT 2007-03-09
Domestic Profit 2005-12-14

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
341251981 0418800 2016-02-04 215 SE 8TH AVENUE, FORT LAUDERDALE, FL, 33301
Inspection Type Prog Related
Scope Partial
Safety/Health Safety
Close Conference 2016-02-04
Emphasis P: FALL, L: FALL
Case Closed 2019-12-03

Related Activity

Type Inspection
Activity Nr 1124845
Safety Yes
Type Inspection
Activity Nr 1123707
Safety Yes
Type Inspection
Activity Nr 1124468
Safety Yes
Type Inspection
Activity Nr 1123696
Safety Yes
Type Inspection
Activity Nr 1126145
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 D03 IX
Issuance Date 2016-08-01
Abatement Due Date 2016-08-05
Current Penalty 2100.0
Initial Penalty 3500.0
Final Order 2016-08-08
Nr Instances 2
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(d)(3)(ix): Tiebacks were not secured to a structurally sound anchorage on the building or structure a) On or about 02/03/2016, at the above addressed work site, a tieback for a suspension scaffold was attached to the side of an eye bolt installed vertically on a wall and not secured to a structurally sound anchorage on the building exposing employees to a fall hazard of approximately 50-feet. b) a) On or about 02/03/2016, at the above addressed work site, a tieback for a suspension scaffold was attached to an eye bolt and anchor which was partially pulled out of the concrete and not secured to a structurally sound anchorage on the building exposing employees to a fall hazard of approximately 50-feet.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 D03 X
Issuance Date 2016-08-01
Abatement Due Date 2016-08-05
Current Penalty 2100.0
Initial Penalty 3500.0
Final Order 2016-08-08
Nr Instances 2
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(d)(3)(x): Tiebacks were not installed perpendicular to the face of the building or structure, nor were opposing angle tiebacks installed. a) On or about 02/03/2016, at the above addressed work site, tiebacks for a suspension scaffold on the north side of the building were installed an angle and not installed perpendicular to the face of the building exposing employees to a fall hazard of approximately 50-feet. b) On or about 02/03/2016, at the above addressed work site, a tieback for an outrigger scaffold on the south side of the building was installed an angle and not installed perpendicular to the face of the building exposing employees to a fall hazard of approximately 50-feet.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 D12 I
Issuance Date 2016-08-01
Abatement Due Date 2016-08-05
Current Penalty 2100.0
Initial Penalty 3500.0
Final Order 2016-08-08
Nr Instances 2
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(d)(12)(i): There was not a minimum of 3 wire rope clips installed, with the clips a minimum of 6 rope diameters apart: a) On or about 02/03/2016, at the above addressed work site, tiebacks for parapet clamp scaffolds on the north side of the building did not have a minimum of three wire rope clips exposing employees to a fall hazard. of approximately 50 feet. b) a) On or about 02/03/2016, at the above addressed work site, tiebacks for parapet clamp scaffolds on the pool deck did not have a minimum of three wire rope clips exposing employees to a fall hazard of approximately 50-feet.
313101453 0418800 2009-05-08 17055 MERIDIAN AVE., MIAMI BEACH, FL, 33139
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2009-05-08
Emphasis L: FALL
Case Closed 2009-06-29

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260501 B01
Issuance Date 2009-05-22
Abatement Due Date 2009-06-02
Current Penalty 563.0
Initial Penalty 750.0
Nr Instances 1
Nr Exposed 1
Gravity 03

Date of last update: 02 Apr 2025

Sources: Florida Department of State