Search icon

R. AVILA STUCCO INC - Florida Company Profile

Company Details

Entity Name: R. AVILA STUCCO INC
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

R. AVILA STUCCO INC is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 29 Jan 2004 (21 years ago)
Date of dissolution: 24 Sep 2010 (14 years ago)
Last Event: ADMIN DISSOLUTION FOR ANNUAL REPORT
Event Date Filed: 24 Sep 2010 (14 years ago)
Document Number: P04000020322
FEI/EIN Number 900140272

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 3417 RIDGE RD, WIMAUMA, FL, 33598, US
Mail Address: PO BOX 1890, WIMAUMA, FL, 33598, US
ZIP code: 33598
County: Hillsborough
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
ROCHA RUPERTO President PO BOX 1890, WIMAUMA, FL, 33598
ROCHA RUPERTO Agent 3417 RIDGE RD, WIMAUMA, FL, 33598

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2010-09-24 - -
CANCEL ADM DISS/REV 2005-10-06 - -
ADMIN DISSOLUTION FOR ANNUAL REPORT 2005-09-16 - -

Documents

Name Date
ANNUAL REPORT 2009-05-06
ANNUAL REPORT 2008-07-10
ANNUAL REPORT 2007-04-27
ANNUAL REPORT 2006-02-23
REINSTATEMENT 2005-10-06
Domestic Profit 2004-02-02

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340987585 0420600 2015-10-15 5500 E HILLSBOROUGH AVE, TAMPA, FL, 33610
Inspection Type Planned
Scope Partial
Safety/Health Health
Close Conference 2015-10-15
Emphasis P: FALL, N: SILICA, L: FALL, L: SILICA
Case Closed 2019-12-20

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2015-12-02
Current Penalty 1700.0
Initial Penalty 1700.0
Final Order 2016-04-21
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) (a) At the site employees were performing stucco construction while exposed to a fall hazard on a scaffold that was missing planks on the 12' level on 10/15/2015.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 G01 V
Issuance Date 2015-12-02
Current Penalty 1700.0
Initial Penalty 1700.0
Final Order 2016-04-21
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(v): Each employee on a walkway located within a scaffold was not protected by a guardrail system (with a minimum 200 pound top rail capacity) installed within 9.5 inches (24.1 cm) of and along at least one side of the walkway. (a) At the site, the employee on the scaffold performing stucco work was not protected from a fall hazards by guardrails on a 12' high platform on or about 10/15/2015.
Citation ID 02001
Citaton Type Other
Standard Cited 19101200 E01
Issuance Date 2015-12-02
Abatement Due Date 2016-01-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2016-04-21
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: a) There was no hazard communication program that ensured employees received effective information and training on health hazards of portland cement chemicals, on or about 10/15/2015.
Citation ID 03001
Citaton Type Other
Standard Cited 19030019 C01
Issuance Date 2016-07-21
Abatement Due Date 2016-08-09
Current Penalty 400.0
Initial Penalty 400.0
Final Order 2016-09-16
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: (a) The employer failed to certify to OSHA that Citation 2 - Item 1 (the violation of 1910.1200(e)(1) for not developing, implementing, and/or maintaining at the workplace a written hazard communication program), which was issued on December 2, 2015, had been abated.

Date of last update: 01 Mar 2025

Sources: Florida Department of State