Entity Name: | DRUCTOR CONSTRUCTION, INC. |
Jurisdiction: | FLORIDA |
Filing Type: | Domestic Profit |
Status: | Inactive |
Date Filed: | 05 Jun 2002 (23 years ago) |
Date of dissolution: | 14 Sep 2007 (17 years ago) |
Last Event: | ADMIN DISSOLUTION FOR ANNUAL REPORT |
Event Date Filed: | 14 Sep 2007 (17 years ago) |
Document Number: | P02000062069 |
FEI/EIN Number | 300082735 |
Address: | 1521 ALTON ROAD, 423, MIAMI BEACH, FL, 33139 |
Mail Address: | 1521 ALTON ROAD #423, 423, CORAL GABLES, FL, 33134 |
ZIP code: | 33139 |
County: | Miami-Dade |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
DRUCTOR PAUL J | Agent | 233 ROMANO AVE, CORAL GABLES, FL, 33134 |
Name | Role | Address |
---|---|---|
DRUCTOR PAUL J | President | 233 ROMANO AVE, CORAL GABLES, FL, 33134 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2007-09-14 | No data | No data |
CHANGE OF PRINCIPAL ADDRESS | 2006-04-07 | 1521 ALTON ROAD, 423, MIAMI BEACH, FL 33139 | No data |
CHANGE OF MAILING ADDRESS | 2006-04-07 | 1521 ALTON ROAD, 423, MIAMI BEACH, FL 33139 | No data |
CANCEL ADM DISS/REV | 2005-03-02 | No data | No data |
REGISTERED AGENT ADDRESS CHANGED | 2005-03-02 | 233 ROMANO AVE, CORAL GABLES, FL 33134 | No data |
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2003-09-19 | No data | No data |
Name | Date |
---|---|
ANNUAL REPORT | 2006-04-07 |
REINSTATEMENT | 2005-03-02 |
Domestic Profit | 2002-06-05 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
339420721 | 0418800 | 2013-09-19 | 416 SW 11TH AVENUE, FORT LAUDERDALE, FL, 33312 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2013-09-27 |
Current Penalty | 960.0 |
Initial Penalty | 1600.0 |
Final Order | 2013-10-21 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about 9/19/2013, at the above addressed job site, an employee was installing veneer brick on the exterior structure of a residential home and was exposed to a 7 ' fall hazard while working from a one-tier scaffold that was not fully planked. |
Citation ID | 01002A |
Citaton Type | Serious |
Standard Cited | 19260451 C02 |
Issuance Date | 2013-09-27 |
Current Penalty | 1200.0 |
Initial Penalty | 2000.0 |
Final Order | 2013-10-21 |
Nr Instances | 2 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: On or about 9/19/2013, at the above addressed job site, the employer did not ensure scaffolds were erected with base plates and mud sills. Instance 1: An employee working from a one-tier scaffold without baseplates and mudsills. Instance 2: An employee using a two-tier scaffold to access a roof did not have baseplates or mudsills. |
Citation ID | 01002B |
Citaton Type | Serious |
Standard Cited | 19260451 C02 II |
Issuance Date | 2013-09-27 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2013-10-21 |
Nr Instances | 2 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2)(ii): Unstable objects were used to support scaffolds or platform units: On or about 9/19/2013, at the above addressed job site, the employer did not ensure scaffolds were supported with the correct components to keep the scaffold level. Instance 1: An employee installing veneer brick on the exterior structure while working from a one-tier scaffold supported with cement block units. Instance 2: An employee used a two-tier scaffold supported with cement block units to access a roof. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260501 B01 |
Issuance Date | 2013-09-27 |
Current Penalty | 1200.0 |
Initial Penalty | 2000.0 |
Final Order | 2013-10-21 |
Nr Instances | 2 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: On or about 9/19/2013, at the above addressed job site, an employee was exposed to a fall hazard of approximately 13 feet while working at a construction site. Instance 1: An employee on a 4:12 pitch roof applying grout between the bricks without fall protection equipment. Instance 2: An employee using a walking platform without guard rails to access the roof. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19261053 B13 |
Issuance Date | 2013-09-27 |
Current Penalty | 720.0 |
Initial Penalty | 1200.0 |
Final Order | 2013-10-21 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step: On or about 9/19/2013, at the above addressed job site, an employee was exposed to a fall hazard of approximately 6 feet while using the top step of an A-Frame ladder to descend from a one-tier scaffold. |
Date of last update: 03 Feb 2025
Sources: Florida Department of State