Search icon

COPELAND CONSTRUCTION GROUP, INCORPORATED - Florida Company Profile

Company Details

Entity Name: COPELAND CONSTRUCTION GROUP, INCORPORATED
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

COPELAND CONSTRUCTION GROUP, INCORPORATED is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 28 Sep 2001 (23 years ago)
Date of dissolution: 25 Oct 2018 (6 years ago)
Last Event: PENDING REINSTATEMENT
Event Date Filed: 25 Oct 2018 (6 years ago)
Document Number: P01000095713
FEI/EIN Number 651143375

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 14411 Commerce Way, Miami Lakes, FL, 33016, US
Mail Address: 14411 Commerce Way, Miami Lakes, FL, 33016, US
ZIP code: 33016
County: Miami-Dade
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
COPELAND Vory President 14411 Commerce Way, Miami Lakes, FL, 33016
Copeland Marlan Vice President 14411 Commerce Way, Miami Lakes, FL, 33016
Copeland Sonya Secretary 14411 Commerce Way, Miami Lakes, FL, 33016
COPELAND Vory Agent 14411 Commerce Way, Miami Lakes, FL, 33016

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2016-09-23 - -
REGISTERED AGENT ADDRESS CHANGED 2014-05-01 14411 Commerce Way, 315, Miami Lakes, FL 33016 -
CHANGE OF PRINCIPAL ADDRESS 2014-05-01 14411 Commerce Way, 315, Miami Lakes, FL 33016 -
CHANGE OF MAILING ADDRESS 2014-05-01 14411 Commerce Way, 315, Miami Lakes, FL 33016 -
REGISTERED AGENT NAME CHANGED 2014-05-01 COPELAND, Vory -
NAME CHANGE AMENDMENT 2008-09-25 COPELAND CONSTRUCTION GROUP, INCORPORATED -
AMENDMENT AND NAME CHANGE 2008-04-16 GS TRIUMPH CORPORATION -
AMENDMENT 2008-01-07 - -

Documents

Name Date
ANNUAL REPORT 2015-03-02
ANNUAL REPORT 2014-05-01
ANNUAL REPORT 2013-01-17
ANNUAL REPORT 2012-02-13
ANNUAL REPORT 2011-06-22
ANNUAL REPORT 2011-05-20
ANNUAL REPORT 2011-04-28
ANNUAL REPORT 2010-03-10
ANNUAL REPORT 2009-03-23
Name Change 2008-09-25

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339674475 0418800 2014-03-21 1321 MARTIN LUTHER KING BLVD., SOUTH BAY, FL, 33493
Inspection Type Complaint
Scope Partial
Safety/Health Safety
Close Conference 2014-03-21
Emphasis L: FALL
Case Closed 2018-11-26

Related Activity

Type Complaint
Activity Nr 877267
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2014-09-19
Current Penalty 2800.0
Initial Penalty 2800.0
Final Order 2014-10-14
Nr Instances 1
Nr Exposed 5
Related Event Code (REC) Complaint
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): Where scaffold platforms were more than 2 feet above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers, stairway-type ladders, ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used for access: a). On or about March 21, 2014, at the above addressed jobsite, employees were exposed to a fall hazard while mounting/dismounting a scaffold from a ladder, for which the platform was more than 2 feet above/below the point of access.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 G04 I
Issuance Date 2014-09-19
Current Penalty 2800.0
Initial Penalty 2800.0
Final Order 2014-10-14
Nr Instances 1
Nr Exposed 5
Related Event Code (REC) Complaint
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews: a). On or about March 21, 2014, at the above addressed jobsite, employees were exposed to a fall hazard while working from a scaffold which was missing a mid-rail at one section/area of the scaffold.

Date of last update: 01 Mar 2025

Sources: Florida Department of State