Entity Name: | MADICO, INC. |
Jurisdiction: | FLORIDA |
Filing Type: | Foreign Profit |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 11 Jan 1984 (41 years ago) |
Last Event: | CORPORATE MERGER |
Event Date Filed: | 18 Dec 2012 (12 years ago) |
Document Number: | P00552 |
FEI/EIN Number |
042807288
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 9251 Belcher Road N., Pinellas Park, FL, 33782, US |
Mail Address: | 9251 Belcher Road N., Pinellas Park, FL, 33782, US |
ZIP code: | 33782 |
County: | Pinellas |
Place of Formation: | MASSACHUSETTS |
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
EMPLOYEES' SAVINGS PLAN OF MADICO, INC. | 2018 | 042807288 | 2019-10-14 | MADICO, INC. | 219 | |||||||||||||||||||||||||||||||||||||
|
Active participants | 187 |
Retired or separated participants receiving benefits | 0 |
Other retired or separated participants entitled to future benefits | 59 |
Deceased participants whose beneficiaries are receiving or are entitled to receive benefits | 0 |
Number of participants with account balances as of the end of the plan year | 241 |
Number of participants that terminated employment during the plan year with accrued benefits that were less than 100% vested | 0 |
Signature of
Role | Plan administrator |
Date | 2019-10-14 |
Name of individual signing | CHRIS LAYNE |
Valid signature | Filed with authorized/valid electronic signature |
Name | Role | Address |
---|---|---|
Storms John | President | 9251 Belcher Road N., Pinellas Park, FL, 33782 |
Plummer Jeffrey | Vice President | 5939 Bayview Circle Court, South Gulfport, FL, 33707 |
Killgo Aya | Director | 9251 Belcher Road N., Pinellas Park, FL, 33782 |
Yamaoka Mika | Director | 9251 Belcher Road N., Pinellas Park, FL, 33782 |
Sakurai Taiji | Director | 9251 Belcher Rd N, Pinellas Park, FL, 33782 |
Node Kazuyoshi | Director | 9251 Belcher Road N., Pinellas Park, FL, 33782 |
CT CORPORATION SYSTEM | Agent | 1200 S. PINE ISLAND ROAD, PLANTATION, FL, 33324 |
Registration Number | Fictitious Name | Status | Filed Date | Expiration Date | Cancellation Date | Mailing Address |
---|---|---|---|---|---|---|
G13000009314 | MADICO WINDOW FILMS | EXPIRED | 2013-01-27 | 2018-12-31 | - | 2630 FAIRFIELD AVENUE S., ST. PETERSBURG, FL, 33712 |
G13000009315 | MADICO WINDOW FILMS, INC. | EXPIRED | 2013-01-27 | 2018-12-31 | - | 2630 FAIRFIELD AVENUE S., ST. PETERSBURG, FL, 33712 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
CHANGE OF MAILING ADDRESS | 2019-04-18 | 9251 Belcher Road N., Pinellas Park, FL 33782 | - |
CHANGE OF PRINCIPAL ADDRESS | 2019-04-18 | 9251 Belcher Road N., Pinellas Park, FL 33782 | - |
MERGER | 2012-12-18 | - | CORPORATION WAS A MERGER RESULT. TOTAL NUMBER OF QUALIFIED CORPORATION(S) INVOLVED WAS 1. MERGER NUMBER 100000127671 |
REINSTATEMENT | 2004-10-22 | - | - |
REVOKED FOR ANNUAL REPORT | 2004-10-01 | - | - |
REINSTATEMENT | 2002-11-04 | - | - |
REVOKED FOR ANNUAL REPORT | 2002-10-04 | - | - |
REINSTATEMENT | 1998-05-22 | - | - |
REVOKED FOR ANNUAL REPORT | 1997-09-26 | - | - |
REGISTERED AGENT NAME CHANGED | 1992-03-17 | CT CORPORATION SYSTEM | - |
Name | Date |
---|---|
ANNUAL REPORT | 2024-04-11 |
ANNUAL REPORT | 2023-04-24 |
ANNUAL REPORT | 2022-06-24 |
ANNUAL REPORT | 2021-04-02 |
ANNUAL REPORT | 2020-05-06 |
ANNUAL REPORT | 2019-04-18 |
ANNUAL REPORT | 2018-05-23 |
AMENDED ANNUAL REPORT | 2017-04-25 |
ANNUAL REPORT | 2017-02-09 |
ANNUAL REPORT | 2016-03-09 |
Contract Type | Award or IDV Flag | PIID | Start Date | Current End Date | Potential End Date | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | IDV | SFBOAD99D0011 | 2008-01-05 | - | - | |||||||||||||||||||
|
NAICS Code | 325211: PLASTICS MATERIAL AND RESIN MANUFACTURING |
Product and Service Codes | 9330: PLASTICS FABRICATED MATERIALS |
Recipient Details
Recipient | MADICO INC |
UEI | DGL4BE6Y89V5 |
Legacy DUNS | 029512717 |
Recipient Address | 4801 S UNIVERSITY DR, FORT LAUDERDALE, 333283839, UNITED STATES |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
347873119 | 0420600 | 2024-11-12 | 9251 BELCHER ROAD NORTH, PINELLAS PARK, FL, 33782 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 2228472 |
Safety | Yes |
Health | Yes |
Inspection Type | Complaint |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2021-10-13 |
Emphasis | N: AMPUTATE |
Case Closed | 2022-03-01 |
Related Activity
Type | Complaint |
Activity Nr | 1819120 |
Safety | Yes |
Inspection Type | Referral |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2019-11-21 |
Emphasis | N: AMPUTATE |
Case Closed | 2019-12-20 |
Related Activity
Type | Referral |
Activity Nr | 1467797 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19100147 C04 II A |
Issuance Date | 2019-11-25 |
Current Penalty | 11934.0 |
Initial Penalty | 11934.0 |
Final Order | 2019-12-18 |
Nr Instances | 1 |
Nr Exposed | 15 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(4)(ii)(A): The energy control procedures did not contain a specific statement on the intended use of the procedure: a. On or about June 17, 2019, at the jobsite on coating line two, the Lockout / Tagout program provided to employees operating the Nordson Extrusion Dies Industries (EDI) Ultracoat II Slot Die and the TEKNEK XWCH3 Wide Web Cleaner did not provide the employees a step-by-step procedure or direction on when a LOTO device is required, the purpose of the steps being performed, or how the procedure is protecting employees. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19100147 C06 I A |
Issuance Date | 2019-11-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-12-18 |
Nr Instances | 1 |
Nr Exposed | 15 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(6)(i)(A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected: a. On or about June 26, 2019, the periodic inspection of the Lockout / Tagout program for the machinery on coating line two was conducted by employees who routinely work on coating line two and or whom performed routine maintenance on the machinery. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19100147 C06 II |
Issuance Date | 2019-11-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-12-18 |
Nr Instances | 1 |
Nr Exposed | 15 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection: a. On or about June 26, 2019, the periodic inspection of the Lockout / Tagout program for the machinery on coating line dated 10/14/18 has the 001-902 written down for the LOTO number on the Periodic Inspection form and there are three names listed in the space for the Inspector. b. On or about June 26, 2019, the periodic inspection of the LOTO program for the machinery on coating line dated 12/21/17 does not have the equipment name and or Lockout / Tagout number listed on the Periodic Inspection forms. |
Citation ID | 01001D |
Citaton Type | Serious |
Standard Cited | 19100147 C07 I |
Issuance Date | 2019-11-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-12-18 |
Nr Instances | 1 |
Nr Exposed | 15 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: a. On or about June 26, 2019, employees working on coating line two were not provided specific Lockout / Tagout (LOTO) training as to the location of power sources, type of LOTO devices required for machinery being serviced and or cleaned and methods of verifying the stored energy has been released, thus exposing employees to severe lacerations and amputations hazards. |
Citation ID | 01001E |
Citaton Type | Serious |
Standard Cited | 19100147 C06 I D |
Issuance Date | 2019-11-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-12-18 |
Nr Instances | 1 |
Nr Exposed | 15 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(6)(i)(D): Where tagout was used for energy control, the periodic inspection did not include a review between the inspector and each authorized and affected employee of the employee's responsibilities under the energy control procedure being inspected, and the elements set forth in paragraph (c)(7)(ii) of this section: a. On or about June 26, 2019, the periodic inspections from 2017 & 2018 of the Lockout / Tagout program for the machinery on coating line two was not conducted for each authorized employee that works and or performs maintenance on the machinery for coating line two. |
Date of last update: 01 Mar 2025
Sources: Florida Department of State