SRM Materials Punta Gorda
|
Surface
|
Active
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
Take I-75 South to Exit 143,and go east (Right) off of the exit until the road ends. Turn North (Left) at the stop sign and follow SR 31 for 5 miles. Turn West (Left) on Cook Brown Rd and Coral Rock is 1/2 mile left side.
|
Parties
Name
|
Magnum Materials LLC
|
Role
|
Operator
|
Start Date
|
2015-06-12
|
End Date
|
2023-08-08
|
|
Name
|
SRM Materials
|
Role
|
Operator
|
Start Date
|
2023-08-09
|
|
Name
|
Florida CRI Inc
|
Role
|
Operator
|
Start Date
|
1999-03-01
|
End Date
|
2015-06-11
|
|
Name
|
Coral Rock Inc
|
Role
|
Operator
|
Start Date
|
1987-12-28
|
End Date
|
1999-02-28
|
|
Name
|
Coral Rock Inc
|
Role
|
Operator
|
Start Date
|
1980-05-01
|
End Date
|
1987-12-27
|
|
Name
|
Michael Hollingshead
|
Role
|
Current Controller
|
Start Date
|
2023-08-09
|
|
Name
|
SRM Materials
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2006-08-08
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee was cleaning a inclined conveyor platform at conveyor Rock #2 when he slipped and fell to the ground. He braced his fall with his right arm inflicting bruised ribs and a broken wrist. He was not in a safety harness or manlift with safety harness to clean the non-catwalk side of conveyor as required.
|
|
Accident Date |
2005-10-10
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by falling object
|
Ocupation |
Welder (shop)
|
Narrative |
I sent welders out back to pit to flip teeth on dragline bucket. All you need is a torch and hammer. after you cut find out of teeth you have to knock them off but they cut one off and it fell off and EE's foot was up under it.
|
|
Accident Date |
2002-04-04
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
NEC
|
Ocupation |
Backhoe operator, Trackhoe operator, Crane operator
|
Narrative |
EMPLOYEE FOUND INJURED SLUMPED OVER IN HIS SEAT ON HIS EQUIP (DRAGLINE) HE CALLED FOR SUPERVISORAND 911 EMR WAS CALLED. EMR TRANSPORTED TO SW FA REGIONAL HOSPITAL. HE FAINTED.
|
|
Accident Date |
2001-04-04
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Welder (shop)
|
Narrative |
AS A WELDER, THE EE WAS PULLING ON A LARGE PIECE OF STEEL AND EITHER PULLED OR TWISTED BACK.
|
|
Accident Date |
2001-03-29
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by... NEC
|
Ocupation |
Welder (shop)
|
Narrative |
EE USING AN ELEC GRINDER-PART OF GRINDING WHEEL BROKE-CAUSING THE TOOL TO JUMP OR JERK WITH FORCE COMING BACK AND STRIKING THE EE IN THE RIGHT KNEE.
|
|
Accident Date |
2001-02-26
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck against stationary object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
HIT LEFT WRIST ON OFFICE DOOR.
|
|
Accident Date |
2000-04-28
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Welder (shop)
|
Narrative |
GETTING OUT OF WELDING TRUCK, SLIPPED AND TURNEDLEFT KNEE.
|
|
Inspections
Start Date |
2024-11-06
|
End Date |
2024-11-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2024-08-14
|
End Date |
2024-08-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2024-02-01
|
End Date |
2024-02-01
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2024-01-09
|
End Date |
2024-01-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2017-04-27
|
End Date |
2017-04-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2016-10-24
|
End Date |
2016-10-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.75
|
|
Start Date |
2016-05-17
|
End Date |
2016-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2016-05-17
|
End Date |
2016-05-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2015-11-19
|
End Date |
2015-11-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2015-11-19
|
End Date |
2015-11-20
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2012-06-12
|
End Date |
2012-06-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.25
|
|
Start Date |
2011-10-26
|
End Date |
2011-10-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2011-06-20
|
End Date |
2011-06-20
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.25
|
|
Start Date |
2011-06-08
|
End Date |
2011-06-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2011-01-13
|
End Date |
2011-01-13
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2010-10-04
|
End Date |
2010-10-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2010-08-30
|
End Date |
2010-09-09
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2010-05-19
|
End Date |
2010-05-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.75
|
|
Start Date |
2010-01-11
|
End Date |
2010-01-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
36.5
|
|
Start Date |
2009-10-16
|
End Date |
2009-10-16
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
12417
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2070
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
1055
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1055
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
950
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
950
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
16790
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2399
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
3744
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1872
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
3448
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
690
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
866
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
433
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
18
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
18
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
952
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
952
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
13343
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2224
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
2120
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2120
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
25574
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
2325
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
2189
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2189
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
36053
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
2575
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
66290
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
32
|
Avg. Employee Hours
|
2072
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
83153
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
33
|
Avg. Employee Hours
|
2520
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
74259
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
32
|
Avg. Employee Hours
|
2321
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
59784
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
28
|
Avg. Employee Hours
|
2135
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
59826
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
31
|
Avg. Employee Hours
|
1930
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
87498
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
29
|
Avg. Employee Hours
|
3017
|
|
|
Clifton Quarry
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
I75 to US 27 Exit at Ocala, South on US 27 to 27th Ave, Turn North about 3 miles to mine on the left or west side.
|
Parties
Name
|
Steven Counts Inc
|
Role
|
Operator
|
Start Date
|
2003-05-01
|
End Date
|
2011-11-20
|
|
Name
|
Magnum Materials LLC
|
Role
|
Operator
|
Start Date
|
2011-11-21
|
End Date
|
2016-10-02
|
|
Name
|
Magnum Materials LLC
|
Role
|
Operator
|
Start Date
|
2016-10-03
|
End Date
|
2020-03-16
|
|
Name
|
Allstar Materials LLC
|
Role
|
Operator
|
Start Date
|
2020-03-17
|
|
Name
|
Martin Marietta Materials
|
Role
|
Operator
|
Start Date
|
2002-07-18
|
End Date
|
2003-04-30
|
|
Name
|
Limerock Industries Inc
|
Role
|
Operator
|
Start Date
|
1995-07-01
|
End Date
|
2002-07-17
|
|
Name
|
Boutwell Limerock Mining Inc
|
Role
|
Operator
|
Start Date
|
1987-08-01
|
End Date
|
1995-06-30
|
|
Name
|
Scott Ritchey
|
Role
|
Current Controller
|
Start Date
|
2020-03-17
|
|
Name
|
Allstar Materials LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2006-01-28
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by rolling or sliding object
|
Ocupation |
Greaser, Grease man, Oiler, Lube man, Dragline oiler
|
Narrative |
Employee was servicing a crusher on ground level when a off-road truck was dumping a load of limerock on top of a ramp. A large rock rolled down the hill striking the employee knocking him into a 10 foot pit which was dug under the crusher to catch the screenings. After examination and MRI, patient had torn ligaments and contusions.
|
|
Accident Date |
2005-01-20
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
EE STATES THAT EE WAS TRYING TO ROLL THE HAMMER DRUM IN THE ROCK CRUSHER WHILE REPLACING THE BELT. THE DRUM BEGAN TO ROLL PINNING LEFT ANKLE BETWEEN THE HAMMER AND THE ROCK CRUSHER HOPPER. THE EQUIPMENT HAD BEEN LOCK OUT AND TAGGED BUT EMPLOYEES WERE MOVING THE DRUM TO REPLACE THE BELTS.
|
|
Inspections
Start Date |
2018-10-18
|
End Date |
2018-10-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2018-08-14
|
End Date |
2018-08-14
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2018-05-21
|
End Date |
2018-05-21
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.75
|
|
Start Date |
2018-05-08
|
End Date |
2018-05-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22
|
|
Start Date |
2017-10-17
|
End Date |
2017-10-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2017-04-05
|
End Date |
2017-04-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2016-11-03
|
End Date |
2016-11-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.25
|
|
Start Date |
2016-07-01
|
End Date |
2016-07-01
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2016-07-01
|
End Date |
2016-07-01
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2016-06-30
|
End Date |
2016-06-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.25
|
|
Start Date |
2016-06-30
|
End Date |
2016-06-30
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2016-01-07
|
End Date |
2016-01-07
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2015-12-14
|
End Date |
2015-12-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.75
|
|
Start Date |
2015-12-14
|
End Date |
2015-12-16
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.75
|
|
Start Date |
2015-05-14
|
End Date |
2015-05-14
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.75
|
|
Start Date |
2015-05-13
|
End Date |
2015-05-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.25
|
|
Start Date |
2014-10-08
|
End Date |
2014-10-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2014-07-28
|
End Date |
2014-07-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.25
|
|
Start Date |
2013-11-21
|
End Date |
2013-11-22
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2013-05-06
|
End Date |
2013-05-09
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
11.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
8161
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1632
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
1958
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1958
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
1637
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1637
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
8537
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1707
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2017
|
Annual Hours
|
963
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
963
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
2563
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2563
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
18344
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1668
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2016
|
Annual Hours
|
3019
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1510
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
3383
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1692
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
27636
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
17
|
Avg. Employee Hours
|
1626
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2015
|
Annual Hours
|
2040
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1020
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
3807
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1904
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
25039
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2504
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2014
|
Annual Hours
|
2969
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
990
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2014
|
Annual Hours
|
3265
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1633
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
15152
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1894
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2013
|
Annual Hours
|
5356
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1339
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
2366
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2366
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
14107
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1763
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2012
|
Annual Hours
|
1046
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
349
|
|
|
Diamondback Mine
|
Surface
|
Abandoned
|
Crushed, Broken Limestone NEC
|
|
Directions to Mine |
From Bartow go to I-75, I-75 go north to exit 354 and turn right and go 1/2 mile and turn left on NW 34th Ave. go to NW 21st street turn right, mine on the left
|
Parties
Name
|
Magnum Materials
|
Role
|
Operator
|
Start Date
|
2007-01-02
|
End Date
|
2019-03-06
|
|
Name
|
Counts Const
|
Role
|
Operator
|
Start Date
|
1993-05-01
|
End Date
|
2007-01-01
|
|
Name
|
Counts Construction Co., Inc.
|
Role
|
Operator
|
Start Date
|
2019-03-07
|
|
Name
|
Glenn D Counts
|
Role
|
Current Controller
|
Start Date
|
2019-03-07
|
|
Name
|
Counts Construction Co., Inc.
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2021-02-16
|
End Date |
2021-02-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2020-07-08
|
End Date |
2020-07-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2020-03-09
|
End Date |
2020-03-09
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2020-03-09
|
End Date |
2020-03-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2019-06-06
|
End Date |
2019-06-06
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Start Date |
2019-05-15
|
End Date |
2019-05-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22
|
|
Start Date |
2016-05-24
|
End Date |
2016-05-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2016-05-24
|
End Date |
2016-05-24
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2013-04-11
|
End Date |
2013-04-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2012-10-25
|
End Date |
2012-10-26
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.75
|
|
Start Date |
2012-04-11
|
End Date |
2012-04-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.75
|
|
Start Date |
2011-10-03
|
End Date |
2011-10-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21.5
|
|
Start Date |
2011-03-29
|
End Date |
2011-04-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2010-11-15
|
End Date |
2010-11-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2010-08-16
|
End Date |
2010-08-16
|
Activity |
Part 50 Audit
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2010-04-05
|
End Date |
2010-04-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2009-10-13
|
End Date |
2009-10-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.5
|
|
Start Date |
2009-04-06
|
End Date |
2009-04-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2008-12-01
|
End Date |
2008-12-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Start Date |
2008-04-29
|
End Date |
2008-04-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
48
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
24
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
758
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
253
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
2544
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
848
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
1422
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
711
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
353
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
353
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
2396
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1198
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
292
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
292
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
7180
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2393
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2012
|
Annual Hours
|
941
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
941
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
8667
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2167
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
1261
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1261
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
8605
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2868
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
1710
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1710
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
10252
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2563
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
1219
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1219
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
12023
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
3006
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
1334
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1334
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
13052
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2610
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
2328
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
582
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2006
|
Annual Hours
|
243
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
243
|
|
|
Ocala Quarry
|
Surface
|
Active
|
Leonardite
|
|
Directions to Mine |
From Bartow go to I-75 north to Ocala, exit U.S. 441 north and go north to C.R. 329, west on C.R.329, mine located 1/4 mile past intersection C.R 329 and C.R. 316, mine on north side.
|
Parties
Name
|
MFM Limestone LLC
|
Role
|
Operator
|
Start Date
|
2009-01-05
|
End Date
|
2016-04-25
|
|
Name
|
Magnum Materials LLC
|
Role
|
Operator
|
Start Date
|
2016-04-26
|
End Date
|
2016-10-26
|
|
Name
|
SCI Materials, Inc.
|
Role
|
Operator
|
Start Date
|
2016-10-27
|
End Date
|
2022-10-16
|
|
Name
|
Georgia Stone Products LLC
|
Role
|
Operator
|
Start Date
|
2022-10-17
|
|
Name
|
Summit Materials LLC
|
Role
|
Current Controller
|
Start Date
|
2022-10-17
|
|
Name
|
Georgia Stone Products LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2022-11-01
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
EE was working at the plant on a clog in a discharge pipe. An other EE open the grating to clear out the discharge line. Grating to manhole was not replaced correctly and the other EE step on grating which cause EE to fall and fracture left wrist.
|
|
Accident Date |
2018-02-26
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
The miner was replacing the turn table on SCI's VSI crusher. When pushing the heavy table into place, EE sprained EE's knee.
|
|
Accident Date |
2017-08-16
|
Degree Inhury |
ACCIDENT ONLY
|
Accident Type |
Accident type, without injuries
|
Ocupation |
NO VALUE FOUND
|
Narrative |
SCI Materials's mechanic was preparing to jack up a stacking conveyor using a handheld 20 ton bottle jack. A vehicle was parked underneath the stacker. As the conveyor was jacked up it slowly tilted forward. The support beam of the stacker gently rested onto the hood of the vehicle, causing minimal damage to the hood and windshield. No injuries occurred.
|
|
Accident Date |
2017-06-05
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Rotary bucket excavator operator
|
Narrative |
At 10 am on Monday, June 5th a Cat 773B 50 ton haul truck was backed up to a Linkbelt 350 excavator. While being loaded, an air valve gave way on the truck. This caused the brakes to go out, and the driver backed into the Excavator. The haul truck and driver suffered no damage/injury. The excavator and operator suffered minor damage/minor injury.
|
|
Inspections
Start Date |
2024-11-21
|
End Date |
2024-11-21
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2024-07-23
|
End Date |
2024-07-30
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2024-04-16
|
End Date |
2024-04-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2023-10-30
|
End Date |
2023-11-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.75
|
|
Start Date |
2023-05-23
|
End Date |
2023-05-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28.75
|
|
Start Date |
2022-11-07
|
End Date |
2022-11-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2022-04-05
|
End Date |
2022-04-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32.75
|
|
Start Date |
2022-03-16
|
End Date |
2022-03-17
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
2
|
Total Hours |
26.5
|
|
Start Date |
2022-03-16
|
End Date |
2022-03-17
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
1.75
|
|
Start Date |
2022-03-03
|
End Date |
2022-03-04
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
17.25
|
|
Start Date |
2021-11-15
|
End Date |
2021-11-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2021-05-20
|
End Date |
2021-05-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2021-02-25
|
End Date |
2021-02-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2020-07-14
|
End Date |
2020-07-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.25
|
|
Start Date |
2020-03-05
|
End Date |
2020-03-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.25
|
|
Start Date |
2020-03-05
|
End Date |
2020-03-06
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1.25
|
|
Start Date |
2020-01-17
|
End Date |
2020-01-17
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2020-01-16
|
End Date |
2020-01-17
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
1
|
Total Hours |
10.25
|
|
Start Date |
2019-07-09
|
End Date |
2019-07-12
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
26
|
|
Start Date |
2019-05-17
|
End Date |
2019-05-17
|
Activity |
Other Technical Compliance Investigations
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
17451
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2181
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2024
|
Annual Hours
|
25378
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2538
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
8045
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2011
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
20560
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2570
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2023
|
Annual Hours
|
27066
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
3007
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
7947
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1987
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
50796
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
18
|
Avg. Employee Hours
|
2822
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2022
|
Annual Hours
|
15781
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2254
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
4150
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1383
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
62361
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
26
|
Avg. Employee Hours
|
2399
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2021
|
Annual Hours
|
10557
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2111
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
5982
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2991
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
56455
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
25
|
Avg. Employee Hours
|
2258
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
11055
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2764
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
3760
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1880
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
50625
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
24
|
Avg. Employee Hours
|
2109
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
9697
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2424
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
3313
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1657
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
47001
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
20
|
Avg. Employee Hours
|
2350
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
9105
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2276
|
|
|