Entity Name: | GP CELLULOSE, LLC |
Jurisdiction: | FLORIDA |
Filing Type: | Foreign Limited Liability Co. |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 03 Apr 2014 (11 years ago) |
Last Event: | LC STMNT OF RA/RO CHG |
Event Date Filed: | 22 Jul 2021 (4 years ago) |
Document Number: | M14000002320 |
FEI/EIN Number |
90-0139554
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 133 Peachtree St NE, Atlanta, GA, 30303, US |
Mail Address: | 133 Peachtree St NE, Atlanta, GA, 30303, US |
Place of Formation: | DELAWARE |
Name | Role | Address |
---|---|---|
Darland Tye G. | Manager | 133 Peachtree St NE, Atlanta, GA, 30303 |
Abdallah Munir L. | Manager | 133 Peachtree St NE, Atlanta, GA, 30303 |
Boushka Patrick J | Manager | 133 Peachtree St NE, Atlanta, GA, 30303 |
UNITED AGENT GROUP INC. | Agent | - |
Event Type | Filed Date | Value | Description |
---|---|---|---|
CHANGE OF PRINCIPAL ADDRESS | 2023-04-12 | 133 Peachtree St NE, Atlanta, GA 30303 | - |
CHANGE OF MAILING ADDRESS | 2023-04-12 | 133 Peachtree St NE, Atlanta, GA 30303 | - |
REGISTERED AGENT NAME CHANGED | 2023-04-12 | UNITED AGENT GROUP INC. | - |
LC STMNT OF RA/RO CHG | 2021-07-22 | - | - |
REGISTERED AGENT ADDRESS CHANGED | 2021-07-22 | 801 US HIGHWAY 1, NORTH PALM BEACH, FL 33408 | - |
Document Number | Status | Case Number | Name of Court | Date of Entry | Expiration Date | Amount Due | Plaintiff |
---|---|---|---|---|---|---|---|
J21000216410 | TERMINATED | 1000000886766 | TAYLOR | 2021-04-27 | 2041-05-05 | $ 2,542.59 | STATE OF FLORIDA, DEPARTMENT OF REVENUE, OUT OF STATE COLLECTIONS UNIT, 1415 W US HIGHWAY 90 STE 115, LAKE CITY FL320556156 |
Name | Date |
---|---|
ANNUAL REPORT | 2024-04-24 |
ANNUAL REPORT | 2023-04-12 |
ANNUAL REPORT | 2022-04-26 |
CORLCRACHG | 2021-07-22 |
ANNUAL REPORT | 2021-04-24 |
ANNUAL REPORT | 2020-05-11 |
ANNUAL REPORT | 2019-03-19 |
ANNUAL REPORT | 2018-04-24 |
ANNUAL REPORT | 2017-04-06 |
ANNUAL REPORT | 2016-04-09 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
339794000 | 0419700 | 2014-05-30 | ONE BUCKEYE DR., PERRY, FL, 32347 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 891547 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100119 E03 I |
Issuance Date | 2014-10-15 |
Current Penalty | 5115.0 |
Initial Penalty | 5500.0 |
Final Order | 2014-11-07 |
Nr Instances | 1 |
Nr Exposed | 11 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.119(e)(3)(i): The Process Hazard Analysis did not address the hazards of the process: a. On or about May 28, 2014, in the chlorine dioxide R-8 plant, the Process Hazard Analysis did not address the hazard of deflagration due to contamination of the supply or emergency water sources, or the measures to control those hazards. |
Citation ID | 01002 |
Citaton Type | Other |
Standard Cited | 19100119 J04 III |
Issuance Date | 2014-10-15 |
Current Penalty | 0.0 |
Initial Penalty | 5500.0 |
Final Order | 2014-11-07 |
Nr Instances | 2 |
Nr Exposed | 11 |
Related Event Code (REC) | Referral |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment to maintain its mechanical integrity, was not consistent with applicable manufacturer's recommendations and good engineering practices, or more frequently determined to be necessary by prior operating experience: a. On or about May 28, 2014, at the chlorine dioxide system, the annual external piping inspection had not been conducted for over 20 months, exposing employees to the potential hazard of chlorine dioxide exposure from deteriorating piping system components. b. On or about May 28, 2014, at the chlorine dioxide ERCO R-8 generator, the deflagration vent cover and vent duct interior had not received an annual inspection, exposing employees to the hazard of a potential chlorine dioxide generator vessel rupture. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19100119 J06 III |
Issuance Date | 2014-10-15 |
Current Penalty | 4290.0 |
Initial Penalty | 4675.0 |
Final Order | 2014-11-07 |
Nr Instances | 1 |
Nr Exposed | 8 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.119(j)(6)(iii): The employer did not assure that maintenance materials, spare parts, and equipment were suitable for the process application for which they were used: a. On or about May 28, 2014, chlorine dioxide deflagration vent rain hat did not have a fly-off tether, exposing employees to the hazard of being struck by the metal disk during a deflagration event. |
Date of last update: 01 Apr 2025
Sources: Florida Department of State