Entity Name: | CONTOUR CONSTRUCTION, LLC |
Jurisdiction: | FLORIDA |
Filing Type: | Foreign Limited Liability Co. |
Status: |
Inactive
The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders. |
Date Filed: | 21 Aug 2013 (12 years ago) |
Branch of: | CONTOUR CONSTRUCTION, LLC, NEW YORK (Company Number 3128281) |
Date of dissolution: | 05 Sep 2018 (7 years ago) |
Last Event: | LC WITHDRAWAL |
Event Date Filed: | 05 Sep 2018 (7 years ago) |
Document Number: | M13000005317 |
FEI/EIN Number |
201900538
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 145 PODPADIC ROAD, RICHMONDVILLE, NY, 12149 |
Mail Address: | 145 PODPADIC ROAD, RICHMONDVILLE, NY, 12149 |
Place of Formation: | NEW YORK |
Name | Role | Address |
---|---|---|
CORPORATE ACCESS, INC. | Agent | - |
GALASSO MARTIN AJR. | President | PO BOX 92, SUMMIT, NY, 12175 |
GALASSO MARK A | Vice President | 156 OVERLOOK DRIVE, COBLESKILL, NY, 12043 |
Gaffney Timothy J | Secretary | 136 Fabian Drive, Schenectady, NY, 12306 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
LC WITHDRAWAL | 2018-09-05 | - | - |
LC AMENDMENT | 2013-09-06 | - | - |
Name | Date |
---|---|
LC Withdrawal | 2018-09-05 |
ANNUAL REPORT | 2018-05-29 |
ANNUAL REPORT | 2017-04-07 |
AMENDED ANNUAL REPORT | 2016-08-31 |
ANNUAL REPORT | 2016-03-04 |
ANNUAL REPORT | 2015-03-11 |
ANNUAL REPORT | 2014-04-15 |
LC Amendment | 2013-09-06 |
Foreign Limited | 2013-08-21 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
340136944 | 0420600 | 2014-12-12 | 9190 GROUPER RD, PORT CANAVERAL, FL, 32920 | |||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 926527 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260251 A03 |
Issuance Date | 2015-02-19 |
Current Penalty | 2940.0 |
Initial Penalty | 4900.0 |
Final Order | 2015-03-16 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.251(a)(3): Rigging equipment, when not in use, was not removed from the immediate work area. a. At the site, employees were exposed to struck by and caught in hazards, in that, the wire rope attached to the bucket suspending a 36 inch concrete pipe was not removed from the immediate work area at the completion of the pipe installation, on or about 12/11/2014. |
Date of last update: 02 Apr 2025
Sources: Florida Department of State