Search icon

DOUBLE D PLASTERING & HOME IMPROVEMENT SERVICES, LLC - Florida Company Profile

Company Details

Entity Name: DOUBLE D PLASTERING & HOME IMPROVEMENT SERVICES, LLC
Jurisdiction: FLORIDA
Filing Type: Florida Limited Liability Co.

DOUBLE D PLASTERING & HOME IMPROVEMENT SERVICES, LLC is structured as a Limited Liability Company (LLC), a common business structure that offers its members limited liability protection, separating their personal assets from the company's debts and obligations.
In Florida, LLCs are governed by Title XXXVI, Chapter 605, Florida Revised Limited Liability Company Act

Status: Inactive

The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders.

Date Filed: 03 Jun 2015 (10 years ago)
Date of dissolution: 08 Sep 2018 (7 years ago)
Last Event: PENDING REINSTATEMENT
Event Date Filed: 08 Sep 2018 (7 years ago)
Document Number: L15000097306
Address: 2225 MCCLELLAN STREET, HOLLYWOOD, FL, 33020, US
Mail Address: 2225 MCCLELLAN STREET, HOLLYWOOD, FL, 33020, US
ZIP code: 33020
County: Broward
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
DARLING EBNOLD L President 2225 MCCLELLAN STREET, HOLLYWOOD, FL, 33020
DARLING EBNOLD L Agent 2225 MCCLELLAN STREET, HOLLYWOOD, FL, 33020

Events

Event Type Filed Date Value Description
ADMIN DISSOLUTION FOR ANNUAL REPORT 2016-09-23 - -

Documents

Name Date
Florida Limited Liability 2015-06-03

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340747146 0418800 2015-07-01 914 NE 17TH WAY, FORT LAUDERDALE, FL, 33304
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2015-07-01
Emphasis L: FALL, P: FALL
Case Closed 2019-04-09

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260451 F03
Issuance Date 2015-09-11
Abatement Due Date 2015-10-07
Current Penalty 2800.0
Initial Penalty 2800.0
Final Order 2015-11-06
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: On or about July 1, 2015 at the above addressed job site, employer did not have a competent person perform inspection of scaffold before each work shift, exposing employees to fall hazard of 16 feet.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2015-09-11
Abatement Due Date 2015-10-07
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-11-06
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) On or about July 1, 2015 at the above addressed job site, employees performing stucco application were exposed to fall hazards due to working from a tubular scaffold that was not fully planked at the working level.
Citation ID 01001C
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2015-09-11
Abatement Due Date 2015-10-07
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-11-06
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. On or about July 1, 2015 at the above addressed job site, employees that were performing stucco application from a tubular scaffold were not provided with fall protection in the form of personal fall arrest system or guardrails to protect them from 16 foot fall hazard.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260095 A
Issuance Date 2015-09-11
Abatement Due Date 2015-10-07
Current Penalty 1600.0
Initial Penalty 1600.0
Final Order 2015-11-06
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact. On or about July 1, 2015 at the above addressed job site, employees performing concrete plastering operation were not provided with gloves, exposing them to come in contact with Portland cement (Rinker Stucco Cement) that can cause skin irritation and dermatitis.
Citation ID 02001
Citaton Type Other
Standard Cited 19101200 E01
Issuance Date 2015-09-11
Abatement Due Date 2015-10-07
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-11-06
Nr Instances 1
Nr Exposed 2
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59) On or about July 1, 2015 at the above addressed job site, the employer did not develop or implement a written hazard communication program describing hazardous chemicals, such as but not limited to; Portland cement for employees performing stucco application.

Date of last update: 02 Mar 2025

Sources: Florida Department of State