Entity Name: | DIONET CONSTRUCTION LLC |
Jurisdiction: | FLORIDA |
Filing Type: |
Florida Limited Liability Co.
DIONET CONSTRUCTION LLC is structured as a Limited Liability Company (LLC), a common business structure that offers its members limited liability protection, separating their personal assets from the company's debts and obligations. |
Status: |
Inactive
The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders. |
Date Filed: | 06 May 2014 (11 years ago) |
Date of dissolution: | 25 Sep 2015 (10 years ago) |
Last Event: | ADMIN DISSOLUTION FOR ANNUAL REPORT |
Event Date Filed: | 25 Sep 2015 (10 years ago) |
Document Number: | L14000073444 |
Address: | 621 SAN JUAN DR, ORLANDO, FL, 32807, US |
Mail Address: | 621 SAN JUAN DR, ORLANDO, FL, 32807, US |
ZIP code: | 32807 |
County: | Orange |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
RODRIGUEZ-DIODONET SANTOS G | Manager | 621 SAN JUAN DR, ORLANDO, FL, 32807 |
RODRIGUEZ-DIODONET SANTOS G | Agent | 621 SAN JUAN DR, ORLANDO, FL, 32807 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2015-09-25 | - | - |
Name | Date |
---|---|
Florida Limited Liability | 2014-05-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
340032515 | 0420600 | 2014-10-22 | ORLANDO CROSSINGS 5533 INTERNATIONAL DRIVE, ORLANDO, FL, 32803 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2015-01-21 |
Current Penalty | 2520.0 |
Initial Penalty | 2520.0 |
Final Order | 2015-03-16 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) 4th level, an employee was exposed to a 25' 2" fall hazard, in that, the work platform behind the mud bucket was not fully planked or decked. Observed on or about 10/22/2014. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2015-01-21 |
Current Penalty | 2520.0 |
Initial Penalty | 2520.0 |
Final Order | 2015-03-16 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) Orlando Crossings - An employee in the process of masonry work was exposed to a 25'-2" fall hazard, in that, a guard rail system was not installed on the 4th level work platform where the mud bucket was located. Observed on or about 10/22/2014. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260452 C02 |
Issuance Date | 2015-01-21 |
Current Penalty | 2520.0 |
Initial Penalty | 2520.0 |
Final Order | 2015-03-16 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a) Orlando Crossings, employees in the process of masonry work were exposed to fall hazards up to 31' 2", in that, cross bracing was not adequately installed throughout the tubular welded frame scaffolding system. Observed on or about 10/22/2014. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2014-08-07 |
Emphasis | L: FALL |
Case Closed | 2014-08-26 |
Related Activity
Type | Referral |
Activity Nr | 901732 |
Safety | Yes |
Date of last update: 02 May 2025