Inspection Type |
Referral
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2013-05-16
|
Emphasis |
L: FALL
|
Case Closed |
2018-12-03
|
Related Activity
Type |
Referral |
Activity Nr |
818865 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 |
Issuance Date |
2013-10-17 |
Current Penalty |
2450.0 |
Initial Penalty |
3500.0 |
Final Order |
2014-01-14 |
Nr Instances |
1 |
Nr Exposed |
1 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about May 16, 2013, at the above addressed jobsite, an employee was working on/from a scaffold, to remove stucco from the side of a building, on which each platform was not fully planked. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 VII |
Issuance Date |
2013-10-17 |
Current Penalty |
2450.0 |
Initial Penalty |
3500.0 |
Final Order |
2014-01-14 |
Nr Instances |
1 |
Nr Exposed |
1 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section: a. On or about May 16, 2013, at the above addressed jobsite, an employee was working on/from the second tier/platform of a scaffold, to remove stucco from the side of a building, for which the platform was not equipped with a guardrail system. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260452 C02 |
Issuance Date |
2013-10-17 |
Current Penalty |
2450.0 |
Initial Penalty |
3500.0 |
Final Order |
2014-01-14 |
Nr Instances |
1 |
Nr Exposed |
1 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a. On or about May 16, 2013, at the above addressed jobsite, an employee was working on/from a scaffold, to remove stucco from the side of a building, on which platform frames were missing sections of cross bracing. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19261052 C01 II |
Issuance Date |
2013-10-17 |
Current Penalty |
1960.0 |
Initial Penalty |
2800.0 |
Final Order |
2014-01-14 |
Nr Instances |
1 |
Nr Exposed |
6 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge: a. On or about May 16, 2013, at the above addressed jobsite, four employees were using a stairwell to access the upper(s) floor of a building which was under renovation, and for which the stairway did not have a stair-rail system or hand-rail. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19260020 B01 |
Issuance Date |
2013-10-17 |
Abatement Due Date |
2013-11-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-01-14 |
Nr Instances |
1 |
Nr Exposed |
6 |
Related Event Code (REC) |
Referral |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part: a. On or about May 16, 2013, at the above addressed jobsite, six employees were performing construction/renovation type work activities, for which the employer did not develop and implement such programs (safety program & employee safety violation disciplinary policy) as may be necessary to comply with this part, such as but not limited to; scaffold assembly and stair-rail system assembly/installation, therefore exposing the employees to a fall hazard. NOTE: CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION. |
|
|