Search icon

J BALLER CONSTRUCTION, LLC

Company Details

Entity Name: J BALLER CONSTRUCTION, LLC
Jurisdiction: FLORIDA
Filing Type: Florida Limited Liability Company
Status: Active
Date Filed: 27 Apr 2011 (14 years ago)
Last Event: REINSTATEMENT
Event Date Filed: 05 Oct 2019 (5 years ago)
Document Number: L11000049638
FEI/EIN Number 45-2044926
Address: 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912
Mail Address: 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912
ZIP code: 33912
County: Lee
Place of Formation: FLORIDA

Agent

Name Role Address
BALLER, JEFFREY J Agent 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912

Managing Member

Name Role Address
BALLER, JEFFREY J Managing Member 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912

Events

Event Type Filed Date Value Description
REINSTATEMENT 2019-10-05 No data No data
ADMIN DISSOLUTION FOR ANNUAL REPORT 2019-09-27 No data No data
REGISTERED AGENT NAME CHANGED 2015-10-20 BALLER, JEFFREY J No data
REINSTATEMENT 2015-10-20 No data No data
ADMIN DISSOLUTION FOR ANNUAL REPORT 2015-09-25 No data No data
REGISTERED AGENT ADDRESS CHANGED 2012-04-27 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912 No data
CHANGE OF PRINCIPAL ADDRESS 2012-04-27 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912 No data
CHANGE OF MAILING ADDRESS 2012-04-27 5640 CHELSEY LANE, #203, FORT MYERS, FL 33912 No data

Documents

Name Date
ANNUAL REPORT 2025-02-08
ANNUAL REPORT 2024-02-27
ANNUAL REPORT 2023-03-01
ANNUAL REPORT 2022-08-30
ANNUAL REPORT 2021-01-29
ANNUAL REPORT 2020-05-08
REINSTATEMENT 2019-10-05
ANNUAL REPORT 2018-03-11
ANNUAL REPORT 2017-03-06
ANNUAL REPORT 2016-04-26

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
336307384 0420600 2012-09-07 7411 BELLA LARGO DRIVE, FORT MYERS, FL, 33912
Inspection Type Fat/Cat
Scope Complete
Safety/Health Safety
Close Conference 2012-09-11
Case Closed 2015-10-06

Related Activity

Type Accident
Activity Nr 547230

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260020 B01
Issuance Date 2013-02-25
Abatement Due Date 2013-03-07
Current Penalty 0.0
Initial Penalty 2800.0
Contest Date 2013-03-18
Final Order 2013-09-30
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.20(b)(1): The employer did not initiate and maintain accident prevention programs as necessary to comply with this part: a) For the company doing business as J Baller Construction LLC, and performing construction work at 7451 Bella Largo Dr. in Fort Myers (FL), as noted on or about 09/07/2012. The employer failed to develop a safety program that identifies workplace hazards, provides for training on avoiding those hazards and requires inspections/audits to insure employee/management compliance with the OSHA construction standards in 29 CFR Part 1926.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260021 B02
Issuance Date 2013-02-25
Abatement Due Date 2013-03-07
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2013-03-18
Final Order 2013-09-30
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: (a) For the company doing business as J Baller Construction LLC, and performing construction work at 7451 Bella Largo Dr. in Fort Myers (FL), as noted on or about 09/07/2012. In that the operator of the aerial lift had not been trained in proper use of an aerial lift and hazards of working near energized power lines.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260416 A01
Issuance Date 2013-02-25
Abatement Due Date 2013-03-01
Current Penalty 3500.0
Initial Penalty 6300.0
Contest Date 2013-03-18
Final Order 2013-09-30
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means:(a)(LOCATION)(IDENTIFY SPECIFIC EQUIPMENT AND/OR CONDITIONS)(DESCRIBE HAZARDS WHERE NECESSARY) (a) For the employee working from an aerial lift at 7451 Bella Largo Dr. in Fort Myers (FL), as noted on or about 09/07/2012. While preparing to work with architectural moldings, the operator of the aerial lift put the basket in indirect contact with an energized, overhead power line.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260453 B02 V
Issuance Date 2013-02-25
Abatement Due Date 2013-03-01
Current Penalty 500.0
Initial Penalty 2800.0
Contest Date 2013-03-18
Final Order 2013-09-30
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift: (a) For the employee working from an aerial lift at 7451 Bella Largo Dr. in Fort Myers (FL), as noted on or about 09/07/2012. The employee was not protected from falls while working at heights up to 28-feet.

Date of last update: 23 Feb 2025

Sources: Florida Department of State