Entity Name: | JACK CONSTRUCTION LLC |
Jurisdiction: | FLORIDA |
Filing Type: |
Florida Limited Liability Co.
JACK CONSTRUCTION LLC is structured as a Limited Liability Company (LLC), a common business structure that offers its members limited liability protection, separating their personal assets from the company's debts and obligations. |
Status: |
Active
The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness. |
Date Filed: | 22 Dec 2006 (18 years ago) |
Last Event: | LC STMNT OF RA/RO CHG |
Event Date Filed: | 09 May 2024 (a year ago) |
Document Number: | L06000121664 |
FEI/EIN Number |
432073337
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 27110 ENCLAVE DR., BONITA SPRINGS, FL, 34134, US |
Mail Address: | 27110 ENCLAVE DR., BONITA SPRINGS, FL, 34134, US |
ZIP code: | 34134 |
County: | Lee |
Place of Formation: | FLORIDA |
Name | Role | Address |
---|---|---|
DEBLOIS JACQUES | Manager | 27110 ENCLAVE DR., BONITA SPRINGS, FL, 34134 |
DEBLOIS JACQUES | Agent | 27110 ENCLAVE DR., BONITA SPRINGS, FL, 34134 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
LC STMNT OF RA/RO CHG | 2024-05-09 | - | - |
REGISTERED AGENT ADDRESS CHANGED | 2024-05-09 | 27110 ENCLAVE DR., BONITA SPRINGS, FL 34134 | - |
REGISTERED AGENT NAME CHANGED | 2024-05-09 | DEBLOIS, JACQUES | - |
LC STMNT OF RA/RO CHG | 2018-10-02 | - | - |
REINSTATEMENT | 2018-08-22 | - | - |
ADMIN DISSOLUTION FOR ANNUAL REPORT | 2017-09-22 | - | - |
LC NAME CHANGE | 2007-08-20 | JACK CONSTRUCTION LLC | - |
Name | Date |
---|---|
CORLCRACHG | 2024-05-09 |
ANNUAL REPORT | 2024-02-28 |
ANNUAL REPORT | 2023-03-14 |
ANNUAL REPORT | 2022-01-26 |
ANNUAL REPORT | 2021-03-15 |
ANNUAL REPORT | 2020-03-02 |
ANNUAL REPORT | 2019-04-02 |
CORLCRACHG | 2018-10-02 |
REINSTATEMENT | 2018-08-22 |
ANNUAL REPORT | 2016-03-09 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
338365885 | 0418800 | 2013-01-14 | 960 COLLIER BLVD. NORTH, NAPLES, FL, 34120 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2013-03-29 |
Abatement Due Date | 2013-04-10 |
Current Penalty | 1440.0 |
Initial Penalty | 2400.0 |
Final Order | 2013-04-15 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about January 14, 2013 at the above addressed job site, a fabricated frame scaffold was not fully planked. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260451 E01 |
Issuance Date | 2013-03-29 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2013-04-15 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a. On or about January 14, 2013 at the above addressed job site, employees were working on a fabricated frame scaffold which was not equipped with access ladders. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19260451 F01 |
Issuance Date | 2013-03-29 |
Abatement Due Date | 2013-04-10 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2013-04-15 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(f)(1): Scaffold and/or scaffold components were loaded in excess of their maximum intended loads or rated capacities, whichever was less: a. On or about January 14, 2013 at the above addressed job site, employees were exposed to a fall hazard while standing on cross bracing and guardrails of a scaffold while installing metal framing. |
Citation ID | 01001D |
Citaton Type | Serious |
Standard Cited | 19260451 F03 |
Issuance Date | 2013-03-29 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2013-04-15 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a. On or about January 14, 2013 at the above addressed job site, employees had worked on a fabricated frame scaffold that had not been inspected by a competent person. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260454 A |
Issuance Date | 2013-03-29 |
Abatement Due Date | 2013-04-10 |
Current Penalty | 1440.0 |
Initial Penalty | 2400.0 |
Final Order | 2013-04-15 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold(s) trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold(s) being used and to understand the procedures to control or minimize those hazards: a. On or about January 14, 2013 at the above addressed job site, the employer did not provide training to employees that enabled them to recognize the hazards associated with the use of scaffolds and to understand the procedures to control or minimize those hazards for employees who had been working on a scaffold that lacked planking and access ladders. |
Date of last update: 02 Apr 2025
Sources: Florida Department of State