Directions to Mine |
Hwy 60 West to Brandon; North on I-75 to 3-5 miles to Sadberry Road, turn right on Sadberry Road, mine on left.
|
Parties
Name
|
A Mining Group LLC
|
Role
|
Operator
|
Start Date
|
2008-11-01
|
|
Name
|
Jimmie Crowder Excavating & Land Clearing, Inc
|
Role
|
Operator
|
Start Date
|
1994-09-01
|
End Date
|
2008-10-31
|
|
Name
|
Joseph H Anderson
|
Role
|
Current Controller
|
Start Date
|
2008-11-01
|
|
Name
|
A Mining Group LLC
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2020-04-17
|
End Date |
2020-04-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.75
|
|
Start Date |
2019-10-03
|
End Date |
2019-10-03
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2019-10-03
|
End Date |
2019-10-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.5
|
|
Start Date |
2019-05-02
|
End Date |
2019-05-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.25
|
|
Start Date |
2018-10-01
|
End Date |
2018-10-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.75
|
|
Start Date |
2018-04-30
|
End Date |
2018-05-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2017-12-21
|
End Date |
2017-12-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2017-09-14
|
End Date |
2017-09-14
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2017-04-07
|
End Date |
2017-04-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.5
|
|
Start Date |
2017-02-22
|
End Date |
2017-02-22
|
Activity |
Part 50 Audit
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2016-10-14
|
End Date |
2016-10-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Start Date |
2016-09-22
|
End Date |
2016-09-22
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2016-07-20
|
End Date |
2016-07-20
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.25
|
|
Start Date |
2016-07-20
|
End Date |
2016-07-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2015-10-06
|
End Date |
2015-10-06
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.25
|
|
Start Date |
2015-10-05
|
End Date |
2015-10-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2015-04-24
|
End Date |
2015-04-24
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
1.25
|
|
Start Date |
2015-04-16
|
End Date |
2015-04-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.75
|
|
Start Date |
2015-04-16
|
End Date |
2015-04-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2014-10-15
|
End Date |
2014-10-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
758
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
758
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2020
|
Annual Hours
|
744
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
744
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
642
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
642
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
3464
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1732
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2019
|
Annual Hours
|
2814
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2814
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
3944
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1972
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
3043
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1522
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2018
|
Annual Hours
|
2775
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2775
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
4082
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2041
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
1447
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1447
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2017
|
Annual Hours
|
1880
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1880
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
2423
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
808
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
1740
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1740
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2016
|
Annual Hours
|
2337
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2337
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2016
|
Annual Hours
|
3143
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1572
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
1804
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1804
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2015
|
Annual Hours
|
2391
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2391
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2015
|
Annual Hours
|
3126
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1042
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
2005
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2005
|
|
Sub-Unit Desc
|
DREDGE
|
Year
|
2014
|
Annual Hours
|
2579
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1290
|
|
|
Directions to Mine |
Take Hwy 98 out of Perry, Fl. headed west approx. 14 miles to the junction of Hwy 98 and SR 14. Turn right on SR 14 and the quarry is approx. 1/2 to 1 mile on the right.
|
Parties
Name
|
Conrad Yelvington Dist
|
Role
|
Operator
|
Start Date
|
2017-12-29
|
|
Name
|
A Mining Group LLC
|
Role
|
Operator
|
Start Date
|
2005-09-12
|
End Date
|
2017-12-28
|
|
Name
|
CRH PLC
|
Role
|
Current Controller
|
Start Date
|
2017-12-29
|
|
Name
|
Conrad Yelvington Dist
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2024-07-12
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Absorption of radiations, caustics, toxic and noxious substances
|
Ocupation |
Miner, Prospector, NEC
|
Narrative |
The employee allegedly was bitten by an insect/spider at some point during the day.
|
|
Accident Date |
2020-08-13
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Bodily reaction, NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
EE was operating the scale house and having to bend over to operate the small bucket machine (4-6 times). EE's lower back became sore. EE has a lower back strain.
|
|
Accident Date |
2020-07-21
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Fall onto or against objects
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
EE was walking to pump barge, slipped/fell with right knee striking a rock.
|
|
Accident Date |
2020-02-28
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
While operating a haul truck, the truck was jarred by a bump. The employee felt a little pain in lower back.
|
|
Accident Date |
2019-09-04
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck by falling object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
A piece of aggregate material came off a conveyor and struck the employee in the lower back area. The employee has lower back pain and x-rays were negative. EE was released to light duty.
|
|
Accident Date |
2018-07-09
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Electrician, Lineman
|
Narrative |
Employee was exiting the dragline and fell off (unknown distance 0'-4') landing on the ground. Employee does not know why they fell. It was a sunny and dry day.
|
|
Accident Date |
2014-02-17
|
Degree Inhury |
DYS AWY FRM WRK & RESTRCTD ACT
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
The employee was lifting a skirt board back on to a conveyor system that was being worked on. The skirt board was stuck in the mud so the suction on the object made it heavier than usual. The employee twisted while lifting and pulled a muscle in his lower back. The conveyor that was being worked on was locked out.
|
|
Accident Date |
2013-12-17
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Prep plant foreman, Supervisor, Mill plant supervisor, Kiln supervisor
|
Narrative |
Rock was lodged in chute. Employee tried to wrap a Chain around the rock and the rock broke free and trapped his arm in the chute. Pry bar was used to free his arm. Rock put a hole in his arm. Required stitches.
|
|
Inspections
Start Date |
2024-11-18
|
End Date |
2024-11-18
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2024-11-05
|
End Date |
2024-11-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2024-08-15
|
End Date |
2024-08-19
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2024-07-18
|
End Date |
2024-07-19
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2024-06-28
|
End Date |
2024-06-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2024-05-22
|
End Date |
2024-05-22
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2024-02-28
|
End Date |
2024-02-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.25
|
|
Start Date |
2023-07-24
|
End Date |
2023-07-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
21
|
|
Start Date |
2023-01-17
|
End Date |
2023-01-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2022-08-10
|
End Date |
2022-08-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.75
|
|
Start Date |
2021-10-12
|
End Date |
2021-10-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2021-09-23
|
End Date |
2021-09-23
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2021-06-15
|
End Date |
2021-06-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.75
|
|
Start Date |
2020-10-29
|
End Date |
2020-10-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
20
|
|
Start Date |
2020-05-28
|
End Date |
2020-06-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16.25
|
|
Start Date |
2020-03-02
|
End Date |
2020-03-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2020-03-02
|
End Date |
2020-03-02
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
.5
|
|
Start Date |
2019-05-16
|
End Date |
2019-05-16
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2019-04-03
|
End Date |
2019-04-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.25
|
|
Start Date |
2018-11-29
|
End Date |
2018-11-29
|
Activity |
103 (g) Written Notification Hazard Complaint Inspectio
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
49454
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
20
|
Avg. Employee Hours
|
2473
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
2620
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2620
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
48631
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
20
|
Avg. Employee Hours
|
2432
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2023
|
Annual Hours
|
2731
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2731
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
53788
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
22
|
Avg. Employee Hours
|
2445
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2022
|
Annual Hours
|
2632
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2632
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
53209
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
21
|
Avg. Employee Hours
|
2534
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2021
|
Annual Hours
|
2272
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2272
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
49340
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
20
|
Avg. Employee Hours
|
2467
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2020
|
Annual Hours
|
46529
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
19
|
Avg. Employee Hours
|
2449
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2020
|
Annual Hours
|
2811
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2811
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
34322
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
2640
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2019
|
Annual Hours
|
37183
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
2656
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2019
|
Annual Hours
|
1916
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1916
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
7024
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2341
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2018
|
Annual Hours
|
46834
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
16
|
Avg. Employee Hours
|
2927
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2018
|
Annual Hours
|
3401
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1701
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
14085
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1761
|
|
Sub-Unit Desc
|
MILL OPERATION/PREPARATION PLANT
|
Year
|
2017
|
Annual Hours
|
35834
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
18
|
Avg. Employee Hours
|
1991
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2017
|
Annual Hours
|
3663
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1221
|
|
|