Entity Name: | XTREME POWERLINE CONSTRUCTION, INC. |
Jurisdiction: | FLORIDA |
Filing Type: | Foreign Profit |
Status: |
Inactive
The business entity is inactive. This status may signal operational issues or voluntary closure, raising concerns about the business's ability to repay loans and requiring careful risk assessment by lenders. |
Date Filed: | 08 Oct 2007 (18 years ago) |
Date of dissolution: | 19 Aug 2024 (8 months ago) |
Last Event: | WITHDRAWAL |
Event Date Filed: | 19 Aug 2024 (8 months ago) |
Document Number: | F07000005259 |
FEI/EIN Number |
208378756
Federal Employer Identification (FEI) Number assigned by the IRS. |
Address: | 1925 Lapeer Avenue, Suite 300, PORT HURON, MI, 48060, US |
Mail Address: | 922 7TH STREET, PORT HURON, MI, 48060, US |
Place of Formation: | MICHIGAN |
Name | Role | Address |
---|---|---|
SATRYB KURT | Vice President | 1925 Lapeer Avenue, Suite 300, PORT HURON, MI, 48060 |
SHELDON SCOTT | President | 1925 Lapeer Avenue, Suite 300, PORT HURON, MI, 48060 |
Ledsworth David A | Vice President | 1925 Lapeer Avenue, Suite 300, PORT HURON, MI, 48060 |
Event Type | Filed Date | Value | Description |
---|---|---|---|
REGISTERED AGENT CHANGED | 2024-08-19 | REGISTERED AGENT REVOKED | - |
WITHDRAWAL | 2024-08-19 | - | - |
CHANGE OF MAILING ADDRESS | 2024-08-19 | 1925 Lapeer Avenue, Suite 300, PORT HURON, MI 48060 | - |
REINSTATEMENT | 2017-07-18 | - | - |
CHANGE OF PRINCIPAL ADDRESS | 2017-07-18 | 1925 Lapeer Avenue, Suite 300, PORT HURON, MI 48060 | - |
REVOKED FOR ANNUAL REPORT | 2015-09-25 | - | - |
CANCEL ADM DISS/REV | 2008-11-03 | - | - |
REVOKED FOR ANNUAL REPORT | 2008-09-26 | - | - |
Name | Date |
---|---|
WITHDRAWAL | 2024-08-19 |
ANNUAL REPORT | 2024-03-05 |
ANNUAL REPORT | 2023-03-06 |
ANNUAL REPORT | 2022-02-21 |
ANNUAL REPORT | 2021-01-28 |
ANNUAL REPORT | 2020-01-15 |
ANNUAL REPORT | 2019-02-08 |
ANNUAL REPORT | 2018-04-03 |
REINSTATEMENT | 2017-07-18 |
ANNUAL REPORT | 2014-01-10 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
346391352 | 0419730 | 2022-12-14 | 1525 A1A, INDIALANTIC, FL, 32903 | |||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1977284 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100333 C03 |
Issuance Date | 2023-03-10 |
Current Penalty | 0.0 |
Initial Penalty | 10046.0 |
Final Order | 2023-12-04 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.333(c)(3): When work was to be performed near overhead lines, the lines were not deenergized and grounded, nor were other protective measures provided before work was started: a) Jobsite: 1525 A1A Indialantic, FL 32903 on the corner of Ocean Oaks Dr. and SR A1A, at powerline pole# 4-8724-5723-0-7, while replacing a trip saver switch on a 13kV 3-Phase Circuit live powerline an area of the pole was not properly insulated with dielectric insulation exposing employees to electrical shock and burn hazards, on or about December 12, 2022, |
Date of last update: 03 Apr 2025
Sources: Florida Department of State