Search icon

CASTELLON PLUMBING CORP. - Florida Company Profile

Company Details

Entity Name: CASTELLON PLUMBING CORP.
Jurisdiction: FLORIDA
Filing Type: Domestic Profit

CASTELLON PLUMBING CORP. is structured as a Domestic Profit Corporation, which, in Florida signifies a Profit Corporation (also known as a C-Corporation). This business structure is recognized as a separate legal entity from its owners. This offers shareholders the benefit of limited liability protection, safeguarding their personal assets from the corporation's debts and obligations, and facilitates raising capital through the issuance of stock. In Florida, Domestic Profit Corporations are governed by Title XXXVI, Chapter 607, Florida Statutes – Florida Business Corporation Act.

Status: Active

The business entity is active. This status indicates that the business is currently operating and compliant with state regulations, suggesting a lower risk profile for lenders and potentially better creditworthiness.

Date Filed: 27 Jan 1976 (49 years ago)
Last Event: AMENDMENT
Event Date Filed: 06 Jul 1998 (27 years ago)
Document Number: 494156
FEI/EIN Number 591676886

Federal Employer Identification (FEI) Number assigned by the IRS.

Address: 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
Mail Address: 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
ZIP code: 33018
County: Miami-Dade
Place of Formation: FLORIDA

Key Officers & Management

Name Role Address
CASTELLON GIRALDO President 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
CASTELLON GIRALDO Secretary 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
CASTELLON GIRALDO Director 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
LARA PABLO A Vice President 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
Puente Juan F Treasurer 9841 NW 130 STREET., HIALEAH GARDENS, FL, 33018
Burgos Beatriz A Director 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018
Gonzalez Pedro Director 9841 NW 130 ST, HIALEAH GARDENS, FL, 33018
CASTELLON GIRALDO Agent 9841 NW 130 STREET, HIALEAH GARDENS, FL, 33018

Events

Event Type Filed Date Value Description
CHANGE OF PRINCIPAL ADDRESS 2010-01-18 9841 NW 130 STREET, HIALEAH GARDENS, FL 33018 -
CHANGE OF MAILING ADDRESS 2010-01-18 9841 NW 130 STREET, HIALEAH GARDENS, FL 33018 -
REGISTERED AGENT ADDRESS CHANGED 2010-01-18 9841 NW 130 STREET, HIALEAH GARDENS, FL 33018 -
AMENDMENT 1998-07-06 - -

Documents

Name Date
ANNUAL REPORT 2024-02-09
ANNUAL REPORT 2023-03-15
ANNUAL REPORT 2022-03-20
ANNUAL REPORT 2021-03-09
ANNUAL REPORT 2020-06-03
ANNUAL REPORT 2019-03-05
ANNUAL REPORT 2018-03-05
ANNUAL REPORT 2017-01-25
ANNUAL REPORT 2016-01-11
ANNUAL REPORT 2015-04-19

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340013234 0418800 2014-10-16 610 CURTISWOOD DRIVE, KEY BISCAYNE, FL, 33149
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2014-10-16
Emphasis N: TRENCH
Case Closed 2015-02-12

Related Activity

Type Referral
Activity Nr 915308
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260651 D
Issuance Date 2015-01-12
Abatement Due Date 2015-02-06
Current Penalty 800.0
Initial Penalty 1600.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(d): Employees exposed to public vehicular traffic were not provided with a warning vest or other suitable garments marked with or made of reflectorized or high-visibility material: On or about 10/26/14, at the above addressed jobsite, an employee was installing a drain pipe inside a five (5) foot trench located in front of a residential home on a public road and was not protected from struck-by hazards due to lack of a high-visibility work vest. PLEASE NOTE: CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260651 J02
Issuance Date 2015-01-12
Abatement Due Date 2015-01-23
Current Penalty 2450.0
Initial Penalty 4900.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(j)(2): Employees were not protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations, or by a combination of both if necessary: On or about 10/26/14, at the above addressed jobsite, an employee was installing a drain pipe inside a five (5) foot trench located in front of a residential home on a public road and did not store the excavated material two (2) feet or more away from the trench. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Citation ID 01003A
Citaton Type Serious
Standard Cited 19260651 K01
Issuance Date 2015-01-12
Abatement Due Date 2015-02-06
Current Penalty 2450.0
Initial Penalty 4900.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems: On or about 10/26/14, at the above addressed jobsite, the employer did not ensure trench inspections was made prior to the start of a trenching operation. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Citation ID 01003B
Citaton Type Serious
Standard Cited 19260651 K02
Issuance Date 2015-01-12
Abatement Due Date 2015-02-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.651(k)(2): Where the competent person found evidence of a situation that could result in possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employee(s) was/were not removed from the hazardous area until the necessary precautions have been taken to ensure their safety: On or about 10/26/14, at the above addressed jobsite, the employer did not remove employees from the trench when water accumulation was present. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260652 A01
Issuance Date 2015-01-12
Abatement Due Date 2015-01-23
Current Penalty 2850.0
Initial Penalty 4900.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652(c): On or about 10/26/14, at the above addressed jobsite, the employer did not ensure employees were protected from cave-in hazards by an adequate protective system. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.
Citation ID 01005A
Citaton Type Serious
Standard Cited 19261053 B01
Issuance Date 2015-01-12
Abatement Due Date 2015-01-23
Current Penalty 2450.0
Initial Penalty 4900.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: On or about 10/26/14, at the above addressed jobsite, an employee was installing a drain inside a five (5) foot trench and did not have the ladder's side rails extend at least three (3) feet above the edge of the trench. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS FOR THIS VIOLATION.
Citation ID 01005B
Citaton Type Serious
Standard Cited 19261053 B04
Issuance Date 2015-01-12
Abatement Due Date 2015-01-23
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-02-09
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: On or about 10/26/14, at the above addressed jobsite, an employee was installing a drain inside a five (5) foot trench and was using a six (6) foot A-frame ladder instead of an extension ladder. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS FOR THIS VIOLATION.

Date of last update: 02 Apr 2025

Sources: Florida Department of State